14
Fig. 20 — Gas Piping, Typical Curb Sidewall Piping
(Example 1)
Fig. 21 — Gas Piping, Typical Curb Sidewall Piping
(Example 2)
Fig. 22 — Gas Piping, Typical Thru-Base Connections
When installing the gas supply line, observe local codes pertaining
to gas pipe installations. Refer to the NFPA 54/ANSI Z223.1
NFGC latest edition (in Canada, CAN/CSA B149.1). In the ab-
sence of local building codes, adhere to the following pertinent
recommendations:
• Avoid low spots in long runs of pipe. Grade all pipe
1
/
4
in.
per every 15 ft (7 mm per every 5 m) to prevent traps.
Grade all horizontal runs downward to risers. Use risers to
connect to heating section and to meter.
• Protect all segments of piping system against physical and
thermal damage. Support all piping with appropriate
straps, hangers, etc. Use a minimum of one hanger every 6
ft (1.8 m). For pipe sizes larger than
1
/
2
in., follow recom-
mendations of national codes.
• Apply joint compound (pipe dope) sparingly and only to
male threads of joint when making pipe connections. Use
only pipe dope that is resistant to action of liquefied petro-
leum gases as specified by local and/or national codes. If
using PTFE (Teflon
1
) tape, ensure the material is Double
Density type and is labeled for use on gas lines. Apply tape
per manufacturer’s instructions.
• Pressure-test all gas piping in accordance with local and
national plumbing and gas codes before connecting piping
to unit.
NOTE: Pressure test the gas supply system after the gas supply
piping is connected to the gas valve. The supply piping must be
disconnected from the gas valve during the testing of the piping
systems when test pressure is in excess of 0.5 psig (3450 Pa). Pres-
sure test the gas supply piping system at pressures equal to or less
than 0.5 psig (3450 Pa). The unit heating section must be isolated
from the gas piping system by closing the external main manual
shutoff valve and slightly opening the ground-joint union.
Check for gas leaks at the field-installed and factory-installed
gas lines after all piping connections have been completed. Use
soap-and-water solution (or method specified by local codes
and/or regulations).
NOTE: If orifice hole appears damaged or it is suspected to
have been redrilled, check orifice hole with a numbered drill
bit of correct size. Never redrill an orifice. A burr-free and
squarely aligned orifice hole is essential for proper flame char-
acteristics. See Fig. 23.
9
”
(229mm) MIN
UNION
S
HUT OFF
VALVE
DRIP
LEG
THRU-CURB ADAPTER
UNIT BA
S
E RAIL
S
HUT OFF
VALVE
UNION
9
”
(229mm) MIN
UNIT BA
S
E RAIL
BURNER
ACCESS
PANEL
THRU-CURB ADAPTER
DRIP
LEG
1. Teflon is a registered trademark of DuPont.
WARNING
Failure to follow this warning could result in personal injury,
death and/or property damage.
• Connect gas pipe to unit using a backup wrench to
avoid damaging gas controls.
• Never purge a gas line into a combustion chamber.
• Never test for gas leaks with an open flame. Use a
commercially available soap solution made specifically
for the detection of leaks to check all connections.
• Use proper length of pipe to avoid stress on gas control
manifold.
Содержание 582J 04-06
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 38 Typical Perfect Humidity Adaptive Dehumidification System Humidistat Wiring ...
Страница 23: ...23 Fig 40 Typical Control Wiring Diagram Electro Mechanical with W7212 ...
Страница 25: ...25 Fig 43 Typical IGC Control Wiring Diagram ...