![Bryant 580J*04A Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/bryant/580j-04a/580j-04a_installation-instructions-manual_2822120024.webp)
24
Table 10 — Economizer Module - Right Hand Terminal
Blocks
Use Fig. 38 and Table 11 to locate the wiring terminals for
each enthalpy control sensor.
Fig. 38 — S-Bus Sensor DIP Switches
Table 11 — HH57AC081 Sensor Wiring Terminations
Use Fig. 38 and Table 12 to set the DIP switches for the
desired use of the sensor.
Table 12 — HH57AC081 Sensor DIP Switch
NOTE: When a S-bus sensor is connected to an existing net-
work, it will take 60 minutes for the network to recognize and
auto-configure itself to use the new sensor.
During the 60 minute setup period, no alarms for sensor
failures (except SAT) will be issued and no economizing func-
tion will be available.
CO
2
Sensor Wiring — When using a CO
2
sensor the black
and brown common wires are internally connected and only
one is connected to “IAQ COM” on the W7220. Use the power
from the W7220 to power the CO
2
sensor OR make sure the
ground for the power supplies are common. See Fig. 39 for
CO
2
sensor wiring.
Fig. 39 — CO
2
Sensor Wiring
INTERFACE OVERVIEW —
This section describes how
to use the Economizer’s user interface for:
• Keypad and menu navigation
• Settings and parameter changes
• Menu structure and selection
LABEL
TYPE
DESCRIPTION
Top Right Terminal Blocks
AUX2 I
24 vac IN
The first terminal is not used.
OCC
24 vac IN
Shut Down (SD) or HEAT (W)
Conventional only
and
Heat Pump Changeover (O-B) in Heat
Pump mode.
E-GND
E-GND
Occupied/Unoccupied Input
EXH1
24 vac
OUT
Exhaust Fan 1 Output
AUX1 O
24 vac
OUT
Programmable:
Exhaust fan 2 output
or
ERV
or
System alarm output
Bottom Right Terminal Blocks
Y2-I
24 vac IN
Y2 in - Cooling Stage 2 Input from
space thermostat
Y2-O
24 vac
OUT
Y2 out - Cooling Stage 2 Output to
stage 2 mechanical cooling
Y1-I
24 vac IN
Y1 in - Cooling Stage 2 Input from
space thermostat
Y1-O
24 vac
OUT
Y1 out - Cooling Stage 2 Output to
stage 2 mechanical cooling
C
COM
24 vac Common
R
24 vac
24 vac Power (hot)
DIP
Switch
Label
DIP
Switches
(3)
S-Bus
2 Pin Side
Connector
S-Bus
Terminals
(1 and 2)
TERMINAL
TYPE
DESCRIPTION
NUMBER
LABEL
1
S-BUS
S-BUS
S-BUS
Communications
(Enthalpy Control
Sensor Bus)
2
S-BUS
S-BUS
S-BUS
Communications
(Enthalpy Control
Sensor Bus)
USE
DIP SWITCH POSITIONS FOR SWITCHES 1, 2, AND 3
1
2
3
DA
OFF
ON
OFF
RA
ON
OFF
OFF
OA
OFF
OFF
OFF
CO
2
SENSOR
24V
ANALOG
OUT
L1
(HOT)
L2
RED
BLACK
YELLOW
BROWN
ORANGE
GREEN
+
–
POWER SUPPLY. PROVIDE DISCONNECT
MEANS AND OVERLOAD PROTECTION
AS REQUIRED.
1
1
Содержание 580J*04A
Страница 4: ...4 Fig 2 Unit Dimensional Drawing ...
Страница 5: ...5 Fig 2 Unit Dimensional Drawing cont ...
Страница 21: ...21 Fig 34 580J Size 07 Unit with Perfect Humidity Dehumidification System Humidistat Wiring ...
Страница 37: ...37 Fig 43 Typical RTU Open System Control Wiring Diagram ...
Страница 38: ...38 Fig 44 Typical RTU Open System Control Wiring Diagram with Perfect Humidity ...
Страница 49: ......