background image

B.

Set Temperature Rise

CAUTION:

Temperature rise must be within limits

specified on unit rating plate. Recommended operation is
at midpoint of rise or above. Failure to follow this caution
may result in condensing or overheating the heat ex-
changers.

Furnace must operate within range of temperature rise specified on
the unit rating plate. Determine air temperature rise as follows:

1. Place thermometers in return and supply ducts as near

furnace as possible. Be sure thermometers do not see heat
exchanger so that radiant heat does not affect readings. This
practice is particularly important with straight-run ducts.

2. When thermometer readings stabilize, subtract return-air

temperature from supply-air temperature to determine air
temperature rise.

NOTE:

Temperature rise can be determined for low-fire opera-

tion by placing setup switch SW-2 on control center in ON
position. For high-heat operation, place setup switch SW-2 in OFF
position and jumper R-W2 on control center. DO NOT forget to
return setup switch to OFF position and remove R-W2 jumper
upon completion of testing. (See Fig. 25 for switch and terminal
location.)

3. This furnace is capable of automatically providing proper

airflow to maintain the temperature rise within the range
specified on unit rating plate. If temperature rise is outside
this range, proceed as follows:
a. Check gas input for low- and high-heat operation.

b. Check derate for altitude if applicable.

c. Check all return and supply ducts for excessive restric-

tions causing static pressure greater than 0.5-in. wc.

d. Ensure bypass humidifier switch (BPH) setup switch

SW-3 on control center is in ON position when a bypass
humidifier is used. (See Fig. 25 for switch location.)

e. Check

Troubleshooting

Guide

for

Variable-Speed

2-Stage Electronic Condensing Furnaces.

C.

Set Thermostat Heat Anticipator

The thermostat heat anticipator must be set to match the amp draw
of components in the R-W/W1 circuit. Accurate amp draw
measurements can be obtained at the thermostat subbase terminals
R and W.

Fig. 50 illustrates an easy method of obtaining thermostat amp
draw measurements. The amp reading should be taken after blower
motor has started and furnace is operating in low heat.

1. To operate furnace in low heat, turn setup switch SW-2 to

ON position (See Fig. 25) and connect ammeter leads
across thermostat subbase R-W.

2. See thermostat manufacturer’s instructions for adjusting the

heat anticipator and for varying heating cycle length.

NOTE:

When using an electronic thermostat, set cycle rate for 3

cycles per hr.

3. Return setup switch SW-2 to OFF position and replace

thermostat on subbase.

CHECK SAFETY CONTROLS

I.

CHECK PRIMARY LIMIT CONTROL

This control shuts off the combustion control system and energizes
the air-circulating blower motor if furnace overheats.

1. The recommended method of checking this limit control is

to gradually block off return air after furnace has been
operating for a period of at least 5 minutes.

2. As soon as limit control has shut off burners, a 33 fault code

will appear on control center.

3. The return-air opening should be unblocked to permit

normal air circulation.

By using this method to check the limit control, it can be
established that the limit is functioning properly and the furnace
will operate safely if there is a restricted return-air supply or motor
failure. If the limit control does not function during this test, the
cause must be determined and corrected.

TABLE 14—GAS RATE CU FT/HR

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

1

cu ft

2

cu ft

5

cu ft

1

cu ft

2

cu ft

5

cu ft

10
11
12
13
14

360
327
300
277
257

720
655
600
555
514

1800
1636
1500
1385
1286

50
51
52
53
54

72
71
69
68
67

144
141
138
136
133

360
355
346
340
333

15
16
17
18
19

240
225
212
200
189

480
450
424
400
379

1200
1125
1059
1000

947

55
56
57
58
59

65
64
63
62
61

131
129
126
124
122

327
321
316
310
305

20
21
22
23
24

180
171
164
157
150

360
343
327
313
300

900
857
818
783
750

60
62
64
66
68

60
58
56
54
53

120
116
112
109
106

300
290
281
273
265

25
26
27
28
29

144
138
133
129
124

288
277
267
257
248

720
692
667
643
621

70
72
74
76
78

51
50
48
47
46

103
100

97
95
92

257
250
243
237
231

30
31
32
33
34

120
116
113
109
106

240
232
225
218
212

600
581
563
545
529

80
82
84
86
88

45
44
43
42
41

90
88
86
84
82

225
220
214
209
205

35
36
37
38
39

103
100

97
95
92

206
200
195
189
185

514
500
486
474
462

90
92
94
96
98

40
39
38
38
37

80
78
76
75
74

200
196
192
188
184

40
41
42
43
44

90
88
86
84
82

180
176
172
167
164

450
439
429
419
409

100
102
104
106
108

36
35
35
34
33

72
71
69
68
67

180
178
173
170
167

45
46
47
48
49

80
78
76
75
73

160
157
153
150
147

400
391
383
375
367

110
112
116
120

33
32
31
30

65
64
62
60

164
161
155
150

Fig. 50—Amp Draw Check with Ammeter

A96316

R

Y W G

10 TURNS

THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED
(ANITICIPATOR, CLOCK, ETC.,
MUST BE OUT OF CIRCUIT.)

HOOK-AROUND
AMMETER

EXAMPLE:

5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS

 

=  

0.5 AMPS FOR THERMOSTAT

     ANTICIPATOR SETTING

FROM UNIT 24-V
CONTROL TERMINALS

—42—

Содержание 355M-40-4

Страница 1: ...26 29 Multiventing and Vent Terminations 29 CONDENSATE DRAIN 29 General 29 Application 29 Condensate Drain Protection 29 SEQUENCE OF OPERATION 31 34 Self Test Mode 31 Heating Mode 31 32 Heating Mode T...

Страница 2: ...TLET 26 15 16 28 1 2 22 5 16 19 13 16 5 8 5 16 1 39 7 8 22 1 4 TYP 11 16 7 16 24 3 16 BOTTOM INLET 18 1 4 22 11 16 2 IN COMBUSTION AIR CONN 1 2 IN DIA GAS CONN 7 8 IN DIA POWER CONN 1 2 IN DIA THERMOS...

Страница 3: ...CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY S ELECTROSTATIC CHARGE TO GROUND 2 Firmly touch a clean unpainted metal surface of the furnace chassis which is close to the control Tools held...

Страница 4: ...rican Gas Association 1515 Wilson Boulevard Arlington VA 22209 or from Literature Distribution Before installing the furnace in Canada refer to the current edition of the NSCNGPIC Contact Standards De...

Страница 5: ...ation An alternate location for the condensate trap is the left hand side of casing See Fig 2 and 6 NOTE If the alternate left hand side of casing location is used the factory connected drain and reli...

Страница 6: ...ck for proper connections G Upper Collector Box and Inducer Housing Unused Drain Connections UPPER COLLECTOR BOX DRAIN CONNECTION Attached to the UPPER collector box drain connection is a factory inst...

Страница 7: ...nnected to condensate trap c Connect LOWER collector box drain connection to condensate trap 1 Condensate Trap Located on Left Side of Casing a Connect LOWER collector box drain tube blue and white st...

Страница 8: ...ction E Condensate Trap Freeze Protection Refer to Condensate Drain Protection section for recommenda tions and procedures IV HORIZONTAL LEFT SUPPLY AIR DISCHARGE APPLICATIONS A horizontal left furnac...

Страница 9: ...ace blower is located to the left of combustion and controls section of furnace and conditioned air is discharged to the right CAUTION Local codes may require a drain pan under entire furnace and cond...

Страница 10: ...sure tube pink label is factory connected to the pressure switch for use when furnace is installed in UPFLOW or HORIZONTAL LEFT applications This tube MUST be dis connected and used for the condensate...

Страница 11: ...lution or ventilation air This furnace must be installed so electrical components are protected from water Locate furnace as close to center of air distribution system as possible Locate furnace so co...

Страница 12: ...rtant for low fire only installation III FURNACE LOCATION RELATIVE TO COOLING EQUIPMENT The cooling coil must be installed parallel with or on downstream side of furnace to avoid condensation in heat...

Страница 13: ...talled from Table 1 2 Construct hole in floor per dimensions specified in Table 1 and Fig 13 3 Construct plenum to dimensions specified in Table 1 and Fig 13 4 If downflow subbase KGASB is used instal...

Страница 14: ...lications on Combustible Flooring NOT Using KGASB Subbase Furnace with CD5 or CK5 Coil Assembly or KCAKC Coil Box 19 19 20 20 24 1 2 Upflow Applications 23 24 1 8 23 5 8 24 3 4 Downflow Applications o...

Страница 15: ...on to ensure proper draining When suspended bottom brace supports sides and center blower shelf When unit is supported from the ground blocks or pad should support sides and center blower shelf area F...

Страница 16: ...d in bottom return air opening This panel MUST be in place when side return air is used To remove bottom closure panel perform following 1 Tilt or raise furnace and remove 2 screws holding front fille...

Страница 17: ...gas valve See Fig 48 Piping should be pressure tested in accordance with local and national plumbing and gas codes before furnace has been attached In Canada refer to current edition of NSCNGPIC If pr...

Страница 18: ...n of field wiring See Fig 24 The 24 v circuit contains a 3 amp automotive type fuse located on control center See Fig 25 Any electrical shorts of 24 v wiring during installation service or maintenance...

Страница 19: ...2 CIRCUIT HSI CONNECTOR PL5 6 CIRCUIT MODEL PLUG PL6 3 CIRCUIT COMM CONNECTOR PL7 12 CIRCUIT INDUCER MTR CONNECTOR PL9 2 CIRCUIT HSI CONNECTOR PL10 9 CIRCUIT BLOWER ADAPTER CONNECTOR PL11 1 CIRCUIT I...

Страница 20: ...or 12 gage maximum solid or stranded wire 4 Route EAC leads through right hand wire grommet TABLE 4 ELECTRICAL DATA UNIT SIZE VOLTS HERTZ PHASE OPERATING VOLTAGE RANGE MAXIMUM UNIT AMPS UNIT AMPACITY...

Страница 21: ...ppliance shall operate continuously 5 Test for draft hood equipped appliance spillage at the draft hood relief opening after 5 minutes of main burner opera tion Use the flame of a match or candle 6 Af...

Страница 22: ...ckout may occur NOTE Do not count elbows or pipe sections in terminations or within furnace See shaded areas in Fig 31 32 33 34 and 35 TABLE 5 COMBUSTION AIR AND VENT PIPE TERMINATION CLEARANCES LOCAT...

Страница 23: ...take housing plug fitting in appropriate unused intake housing connection c Insert perforated disk assembly factory supplied in intake housing where combustion air intake pipe will be connected d Inst...

Страница 24: ...2 Pipe or 2 In Concentric 1 1 2 42 37 32 27 22 17 2 70 70 70 70 70 70 042060 2 Pipe or 2 In Concentric 1 1 2 42 37 32 27 22 17 2 70 70 70 70 70 70 042080 060080 2 Pipe or 2 In Concentric 1 1 2 25 20...

Страница 25: ...7 NA NA NA 2 62 60 58 56 51 46 060100 2 Pipe or 2 In Concentric 2 27 22 17 12 7 NA 2 1 2 62 60 58 56 55 53 060120 2 Pipe or 3 In Concentric 3 43 41 39 37 35 34 ALTITUDE UNIT SIZE TERMINATION TYPE PIP...

Страница 26: ...ide edge of pipe for better distribution of primer and cement 6 Clean and dry all surfaces to be joined 7 Check dry fit of pipe and mark insertion depth on pipe NOTE It is recommended that all pipes b...

Страница 27: ...AIN 12 IN CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE WHICHEVER IS GREATER 90 VENT 12 IN SEPARATION BETWEEN BOTTOM OF COMBUSTION AIR AND BOTTOM OF VENT BRACKET COUPLING 12 MINIMUM OVERHANG...

Страница 28: ...tall 90 street elbow into 90 elbow making U fitting A 180 U fitting may be used Sidewall terminations Install bracket as shown in Fig 34 or 35 For applications using vent pipe option indicated by dash...

Страница 29: ...e to corrosive nature of this condensate a condensate pH neutralizing filter may be desired Check with local authorities to determine if a pH neutralizer is required II APPLICATION The furnace A C and...

Страница 30: ...m Separation A93056 COMBUSTION AIR VENT VENT A Fig 40 Sidewall Termination of More Than 12 in Dimension A is Touching or 2 In Maximum Separation A96130 VENT A COMBUSTION AIR COMBUSTION AIR Fig 38 Conc...

Страница 31: ...4 Ignition sequence After HSI ignitor warm up period is completed the gas valve opens permitting gas flow to burners where it is ignited After 5 sec the HSI is de energized and a 2 sec flame sensing...

Страница 32: ...ame is sensed control center holds gas valve open If burner flame is not sensed control center de energizes gas valve and ignition sequence is repeated NOTE Ignition sequence repeats 3 additional time...

Страница 33: ...nues to operate completing a normal blower off delay 11 Post purge The inducer continues operating for 15 sec after gas valve is de energized B Two Speed Applications For details on 2 speed heat pump...

Страница 34: ...5 for all furnace model sizes This compensates for high humidity conditions during cooling operation XI ZONE MODE When setup switch SW 5 MZ is in ON position blower motor control is the same as above...

Страница 35: ...med by pour ing water into the inducer drain side of condensate trap 1 Remove upper inducer housing drain connection cap See Fig 46 2 Connect field supplied 1 2 in ID tube to upper inducer housing dra...

Страница 36: ...are used In this mode main blower speed is recalculated once every minute while furnace is in low heat or continuous fan mode SW 6 COMP TEST OFF Turn switch to ON to initiate component test Furnace wi...

Страница 37: ...e measured with the burner box cover REMOVED b Remove caps that conceal adjustment screws for low and high heat gas valve regulators See Fig 48 c Turn setup switch SW 2 on control center to ON positio...

Страница 38: ...nada U S A 775 43 3 8 1 6 42 3 2 1 4 42 3 3 1 4 42 3 4 1 4 42 3 5 1 5 Altitudes 800 43 3 5 1 5 43 3 7 1 5 43 3 8 1 6 42 3 2 1 4 42 3 3 1 4 2001 825 44 3 8 1 6 43 3 4 1 5 43 3 6 1 5 43 3 7 1 5 43 3 8 1...

Страница 39: ...2 1 3 42 3 3 1 4 42 3 4 1 4 725 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 43 3 7 1 6 43 3 8 1 6 750 44 3 6 1 5 44 3 7 1 6 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 775 44 3 4 1 4 44 3 5 1 5 44 3 6 1 5 44 3 7 1 6 43 3...

Страница 40: ...No Manifold Pressure High Low Orifice No Manifold Pressure High Low Orifice No Manifold Pressure High Low U S A Only 600 43 3 8 1 6 42 3 3 1 4 42 3 4 1 4 42 3 5 1 5 42 3 6 1 5 625 43 3 5 1 5 43 3 6 1...

Страница 41: ...er hr k Multiply gas rate cu ft hr by heating value Btu cu ft l Turn setup switch SW 2 to OFF position and jumper R and W2 thermostat connections See Fig 25 This keeps furnace locked in high heat oper...

Страница 42: ...and for varying heating cycle length NOTE When using an electronic thermostat set cycle rate for 3 cycles per hr 3 Return setup switch SW 2 to OFF position and replace thermostat on subbase CHECK SAFE...

Страница 43: ...CM inducer motor is disconnected the furnace will shut itself down immediately Determine the reason pressure switches did not function properly and correct the condition 5 Turn off 115 v power to furn...

Страница 44: ...nt of Rating Plate ________ Temperature Rise Adjusted Thermostat Anticipator ________ Anticipator Setting Adjusted or ________ Cycle Rate 3 Cycles per Hr Selected Safety Controls Check Operation _____...