background image

Operating instructions 

 

General requirements 

Please note that the small basic stove must be installed taking the specific state 

building regulations into account, "any national or local rules, general specifications 

and application rules must be observed" 

Please consult your competent district master chimney sweep about this prior to 

installation. 

He will advise you on the suitable chimney as well as all other requirements which 

are of relevance for the setup and commissioning of your basic stove. A sufficient 

combustion air supply must be ensured in particular, especially with a well sealed 

building shell, flat ventilation systems etc. in order to guarantee smooth operation. 

Your chimney sweep will be able to help here too. He will also check that the 

fireplace has been connected properly. 

The small basic stove described here is tested according to 

DIN EN 15250:2007, 

15a B-VG Austria)

 and may be attached to a chimney with multiple connections 

provided that the chimney's technical conditions allow this. If the basic stove is 

attached to a chimney with multiple connections, the springs in the firebox door must 

not be removed. This ensures that the door closes automatically after adding more 

fuel and thus the supply pressure of the chimney is not affected. 

Installation site / fire protection regulations 

When setting up the small basic stove, the valid fire protection regulations of the 

German Fire Code Ordinance (FeuVo) must be observed. The specified minimum 

distances to combustible objects and walls must be maintained and the flooring must 

also be protected. 

Note on setting up the fireplace only on surfaces with a sufficient load bearing 

capacity. If the load bearing capacity is not sufficient, suitable measures must be 

taken (e.g. a panel for load distribution) to remedy this. Safety distances: 

300 m

m

 

R

ear

 w

al

Combustible components 

 

 

250 mm 

 

Side 

C

om

bus

tibl

e c

om

pone

nt

 

800 m

m

 

Fr

ont

 

 

 

 

 

Combustible 

components 

 

 

 

Содержание Round Firebox R 250/H

Страница 1: ...www brula de Assembly and operating instructions...

Страница 2: ...The basic stove principle The basic stove also known as a storage stove is synonymous with long lasting and healthy heating And these are precisely the advantages offered by this stove system Compared...

Страница 3: ...N EN 15250 2007 15a B VG Austria and may be attached to a chimney with multiple connections provided that the chimney s technical conditions allow this If the basic stove is attached to a chimney with...

Страница 4: ...6 mg Nm3 Mass flow of flue gas 10 g s Flue gas temperature 240 C Minimum delivery pressure 12 Pa Efficiency 83 1 Total weight with firebox 340 kg Heat output The total amount of energy with is stored...

Страница 5: ...e full amount of fuel as the stove must firstly get used to the development of heat Any smells which occur e g from the firebox door dissipate after a short time Heating up Use 2 0 kg of small pieces...

Страница 6: ...bed of ashes is more than 5 cm high It is staggering how long embers can remain hot in seemingly cold ash That is why ash should never be thrown directly from the stove in the waste bin It is recomme...

Страница 7: ...become hot during combustion and there is a risk of burns Use a glove to open the stove door Do not place combustible objects on or in the direct vicinity of the stove Maintain a distance of at least...

Страница 8: ...not be used for lighting and must not be burnt Liquid fuels Moist or treated wood Wood chips or bark waste Chip boards or comparable coated and uncoated materials Plastics and foams All materials whic...

Страница 9: ...9 Operating instructions Firebox R 250 H 179 0 50 0 59 0...

Страница 10: ...Firebox wall stone 2x Firebox wall stone with cut out 1x Firebox standard 8x Firebox standard 2x 20 cm Firebox wall stone with cut out for wall lining 1x Dipping mortar 2x Firebox lid 1x Firebox floor...

Страница 11: ...2 Self adhesive sealing tape must be applied to the stove doors and platform prior to installation Adhesive is applied to all the component surfaces Only materials and spare parts that have been appr...

Страница 12: ...12 Assembly instructions Step 3 Step 4 Loosely suspend the retaining clips and insert the top plate stone Only materials and spare parts that have been approved by the manufacturer may be used...

Страница 13: ...3 Assembly instructions Step 5 Step 6 Place the top plate stones on the retaining clips and apply adhesive upwards Only materials and spare parts that have been approved by the manufacturer may be use...

Страница 14: ...14 Assembly instructions Step 7 Step 8 Loosely suspend the retaining clips and insert the top plate stone Only materials and spare parts that have been approved by the manufacturer may be used...

Страница 15: ...15 Assembly instructions Step 9 Step 10 Ceramic lining or similar can be applied in individual cases Only materials and spare parts that have been approved by the manufacturer may be used...

Страница 16: ...himney open the room doesn t get warm enough Are the heating requirements too high the appliance too small The stove does not draw properly Is the firewood too moist Has too little wood been placed on...

Страница 17: ...S DIRECTIVE 89 106 EEC and with the following harmonised standard EN 15250 2007 The fireplaces for solid fuels are tested to ensure compliance with the standard requirements by the notified test centr...

Страница 18: ...efficiency index EEI 111 0 Nominal heat output Pnom kW 1 7 Direct heat output kW 1 7 Indirect heat output kW Thermal efficiency at nominal heat output th nom 83 1 Auxiliary current consumption at nomi...

Отзывы: