background image

Operating instructions 

 

Operation of the basic stove 

The fireplace should only be operated by adults, supervise children! Only use 

suitable lighting and burning materials as described in these operating instructions. 

Check whether there is a good combustion air supply to ensure perfect operation of 

the fireplace. 

Initial commissioning 

Loosen the setscrews in the holders on the inside pane. These were tightened to 

secure the glass pane during transportation. 

It must be possible to guide the pane up out of the holder without any great 

resistance. This measure is important to avoid possible stress cracks in the pane 

due to thermal loading. 

All the documents, accessories, tools and other objects provided must be removed 

from the firebox. Inform yourself fully as regards fuels (refer to page 9). To avoid 

cracks and damage when using for the first time, all cladding elements and 

components must be dry. The first burnup should be at a reduced heat, i.e., not with 

the full amount of fuel as the stove must firstly get used to the development of heat. 

Any smells which occur (e.g., from the firebox door) dissipate after a short time. 

Heating up 

Heating up takes longer than 2 minutes and requires a little patience. 

Approx. 4-5 kg of small dry pieces of beech wood (2 to 6 cm in diameter with a max. 

length of 33 cm) and a handful of chippings are ideal for heating up. Since the 

combustion air flows via the pane ventilation into the combustion chamber, it should 

be ensured that the wood is stacked loosely in the combustion chamber. The 

chippings are placed from above in the middle of the pile. 

This allows the combustion air to flow freely through the firewood. 

The air valve is opened fully for heating up and each time more fuel is added. 

To do this, turn the controller clockwise. Stick lighters, long matches or other suitable 

lighters are ideal for lighting the fire in the combustion chamber. The chippings in the 

middle of the wood pile aid ignition. Alternatively, firelighters made of wood wool 

soaked in wax or similar can be used. 

If the draught relationship between the basic stove and chimney is OK, the door can 

be closed straight away. 

Note: The residual moisture from the firewood will initially settle on the glass pane. 

As combustion progresses, the moisture which initially collected on the glass pane 

evaporates.  

To optimise the draught in the chimney, the firebox/draughts and chimney must 

firstly reach their operating temperature.

 

 

Содержание Complete firebox Type B plus 90

Страница 1: ...www brula de Assembly and operating instructions...

Страница 2: ...sic stove principle The basic stove also known as a storage stove is synonymous with long lasting and healthy heating And these are precisely the advantages offered by this stove system Compared to a...

Страница 3: ...rovided that the chimney s technical conditions allow this If the basic stove is attached to a chimney with multiple connections the heating door used must be self closing This ensures that the door c...

Страница 4: ...l C as OGC mg MJ 49 5 NOX emission at 13 O2 stated as NO2 mg m 111 3 NOX emission fuel relationship stated as NO2 mg MJ 72 5 Dust emission at 13 O2 mg m 39 2 Dust emission fuel relationship mg MJ 25 5...

Страница 5: ...ort time Heating up Heating up takes longer than 2 minutes and requires a little patience Approx 4 5 kg of small dry pieces of beech wood 2 to 6 cm in diameter with a max length of 33 cm and a handful...

Страница 6: ...n combustion is ensured If dark threads of smoke form on the tips of the flames the combustion air was reduced too much Maintaining the glowing embers After the flames have gone out an energy loaded f...

Страница 7: ...corner firebox Type Plus 90 R is 6 kg Fireboxes and ceramic reheating surfaces must have a cavity wall construction and be gastight as per the specialist regulations TROL To prevent the door frame fr...

Страница 8: ...etween combustible objects and the stove door If fireplaces are installed in living areas and the combustion air is taken from the room where the fireplace is installed the operator must ensure that t...

Страница 9: ...to light the fire The following must not be used for lighting and must not be burnt Liquid fuels Moist or treated wood Wood chips or bark waste Chip boards or comparable coated and uncoated materials...

Страница 10: ...delivery 1 x stove door platform 1x fireproof adhesive mortar 4 x corner stone with hole 13x corner stone 7x intermediate stone 7x intermediate stone 5 m sealing tape 1 x clip set 4x recessed corner...

Страница 11: ...wing the door open Then tighten the Allen screw on the lower hinge with a 2 mm Allen key Grasp the door from below With a slight lifting motion lift the door slightly so that the lower pin of the hing...

Страница 12: ...12 Operating instructions Assembly instructions stove door platform The panel must be removed...

Страница 13: ...together with the stove door and can be aligned 2 Self adhesive sealing tape must be applied to the chamotte joint planes of the stove doors prior to installation 3 The firebox must be specifically ad...

Страница 14: ...door frame 2 The horizontal clips for the top stone plate to be positioned later on are also placed on the springs of the fourth stone layer 3 The combustion kit for side and rear burnup is integrate...

Страница 15: ...round bar to seal the opening above the burnout Additional static loads on the firebox cover are to be avoided Superstructures must be supported separately Only materials and spare parts that have bee...

Страница 16: ...himney open the room doesn t get warm enough Are the heating requirements too high the appliance too small The stove does not draw properly Is the firewood too moist Has too little wood been placed on...

Страница 17: ...assembly and operating instructions Technical changes to the device by third parties Fragile parts such as glass This product has been manufactured in compliance with current standards of quality con...

Страница 18: ...the provisions of sections 4 5 and 6 of the specialist regulations of the stove and air heating construction trade TROL 2009 version 2010 must be observed for installation and fire and heat protection...

Отзывы: