background image

6

VERTEX 70v User Manual

2

G E N E R A L

• External sample compartment (XSA)

• HTS-XT module (High Throughput Screening Extension)

• Fiber optic coupling module with MIR or NIR fiber probes for solid and 

liquid samples

• FT Raman module (e.g. RAM II)

• FIR bolometer 

• External, water-cooled sources

There is also the possibility to connect several accessories simultaneously (e.g. a
water-cooled Hg-arc source at the rear side, the RAM II FT-Raman module at the right
side, a fibre optics coupling at the right front side, the HYPERION IR microscope at the
left side and a bolometer detector at the front side).

Diagnostic routines help to maintain optimum instrument status and performance. The
internal validation unit (IUV) is located inside the spectrometer. It contains standards
(test samples) used for the validation and testing of the instrument.

Note: Depending on the spectrometer configuration you have ordered, 

your spectrometer may not include all options that are described in 
this manual.

The evacuable VERTEX 70v spectrometer allows measurements under vacuum condi-
tions, i.e. unwanted atmospheric interferents (e.g. water vapor or carbon dioxide) are
eliminated nearly completely from the spectrometer interior. Evacuating the spectrome-
ter is more efficient than purging it or using desiccant cartridges. The result of an opti-
mal measurement under vacuum conditions is an IR spectrum in which no H

2

O or CO

2

absorptions mask weak spectral features of the sample.

The spectrometer design enables a separate evacuation of the spectrometer compart-
ments, i.e. either the complete spectrometer interior (sample compartment plus the opti-
cal bench) or only the optical bench can be evacuated. Vacuum shutters (so called
flaps), which can be equipped with optical or IR windows, allow a ventilation of only the
sample compartment in order to preserve the vacuum in the rest of the optics compart-
ment during a sample exchange or an accessory installation. Evacuating and venting
the sample compartment and/or optics are computer-controlled. Moreover, the spec-
trometer is equipped with two pressure sensors providing for the display of the current
pressure inside the spectrometer optics and/or sample compartment.

VERTEX 70v is supplied with an efficient vacuum pump that can evacuate the spec-
trometer optics within a few minutes. The oil-free vacuum pump prevents the spectrom-
eter optics from being contaminated by hydrocarbons.

Содержание VERTEX 70v

Страница 1: ...User Manual 1007253 VERTEX 70v...

Страница 2: ...rand names registered trademarks etc used in this manual even if not explicitly marked as such are not to be considered unprotected by trademarks law They are the property of their respective owner Th...

Страница 3: ...ion 19 External Components 20 Internal Components 25 Optical Path 29 5 Operation 31 General Information 31 Switching VERTEX 70v On and Off 31 QuickLock 33 Automatic Accessory Recognition 35 Performing...

Страница 4: ...awings 109 E Connecting VERTEX 70v to PC 115 General Information 115 Possible Connection Topologies 116 Selecting Network Addresses 119 Assigning Network Addresses 120 Checking the Connection 123 F El...

Страница 5: ...ures described in this manual Never remove or deactivate any supporting safety systems during spectrometer opera tion Ensure that objects and or material not required for the measurement is out of the...

Страница 6: ...tions and follow the precautions described to avoid personal injury and or property damage Caution Electrical Shock This warning symbol indicates electrical hazard The symbol is located near live part...

Страница 7: ...ty data sheets attached Non observance may cause personal injury Caution Toxic Material This warning symbol indicates the existence of toxic material e g the win dow material KRS 5 Observe the safety...

Страница 8: ...ons are not taken Warning indicates that death severe personal injury or substantial property damage CAN result if proper precautions are not taken Caution indicates that minor personal injury or prop...

Страница 9: ...hnology ensures a signal transmission free from interfer ences and guarantees the highest signal to noise ratio VERTEX 70v can be controlled by any data system PC workstation notebook etc on which the...

Страница 10: ...water vapor or carbon dioxide are eliminated nearly completely from the spectrometer interior Evacuating the spectrome ter is more efficient than purging it or using desiccant cartridges The result of...

Страница 11: ...sary For detailed information about how to install the computer refer to the PC manual DELIVERY SCOPE The basic instrument of VERTEX 70v allows upgrading with additional components and or accessories...

Страница 12: ...any signs of damage contact your local shipping representative before opening the shipping box Warning Do not put a spectrometer into operation that shows signs of damage Failure to do so may result i...

Страница 13: ...be interrupted for example either by disconnecting the safety plug or switching off the mains switch on the spectrometer rear side or disconnecting the pri mary power receptacle Environmental Requirem...

Страница 14: ...ice life ensure that the fol lowing site requirements are met Do not install the spectrometer near sources of potential inductive electrical interference e g pumps switching motors microwave ovens etc...

Страница 15: ...cord length should not exceed 3m Depending on the local conditions the original power cord may need to be exchanged for a power cord that complies with the standards of the country in question The po...

Страница 16: ...n refer to the computer manual After having set up the data cable connection turn on the spectrometer using the mains switch After a few seconds the spectrometer beeps once and starts a self test Afte...

Страница 17: ...g particles from enter ing the spectrometer together with the influent air Note For detailed information about the vacuum pump refer to the user manual provided by the vacuum pump manufacturer Attachm...

Страница 18: ...stall the supplied sealing ring at the attachment flange See figure 5 Press the supplied flexible metal hose against the attachment flange figure 6a and attach the hose to the flange using the supplie...

Страница 19: ...contact with the table on which the spectrometer is placed During the operation the vacuum pump produces an increased noise level In order to reduce the noise level install the supplied noise reductio...

Страница 20: ...figure 8 and pulling out the plug Connect one end of the hose to your supply line for dry air or dry nitrogen gas and insert the other end of the hose into the purge gas inlet for either the sample co...

Отзывы: