3.6 Electric installation
Fig. 4: Connection diagram
- Plug the mains plug into the pump power supply socket (see
- Plug the PWM cable into the pump PWM socket (see
- Connect the power cable according to
at output 230 V (mains power out-
put) in control unit LMS
- Connect the PWM cable according to
at output P1 (PWM control output) in
control unit LMS
Note: For external installation, use the fittings supplied to install the connecting
cables in the boiler.
Installation
26
Variable speed pump HEP 25-180-10
7660118-03
07.16
GB
Содержание HEP 25-180-10
Страница 117: ...2 重 2 1 HEP 25 180 10 WGB 50 110 E BGB 50 110 H 2 2 重 重 重 7660118 03 07 16 HEP 25 180 10 117 CN ...
Страница 118: ...3 3 1 重 1 HEP 25 180 10 1 2 1 2 PWM 118 HEP 25 180 10 7660118 03 07 16 CN ...
Страница 120: ...3 4 WGB 50 110 重 HEP 25 180 10 3 5 HEP 3 3 1 WGB 1 2 1 3 Brötje ADH 1 120 HEP 25 180 10 7660118 03 07 16 CN ...
Страница 134: ...Raum für Notizen Space for notes Notices Appunti Plads til notater Nota s Notatki Místo pro poznámky 掯 134 07 16 ...
Страница 135: ...07 16 135 Raum für Notizen Space for notes Notices Appunti Plads til notater Nota s Notatki Místo pro poznámky 掯 ...