Chapter 1 Preparation of Embroidery Machine
BES-961BC
•
BES-1261BC
22
Rope
L-shaped steel
Rectangular bar
■
When using a crane
Place two rectangular bars on the four L-shaped steels on the bottom of the machine steel
frame. Loop four ropes around the bars and lift the machine.
Note) When lifting the machine, make sure that the ropes do not contact the machine table or the tension plate.
Содержание BES-1261BC
Страница 7: ...5 BES 961BC BES 1261BC 2 1 7 1 6 3 4 5 7 3 2 Belt cover Finger guard BES 961BC ...
Страница 13: ...11 BES 961BC BES 1261BC Setting of thread breakage sensor page 93 Setting of Machine page 96 ...
Страница 18: ...16 BES 961BC BES 1261BC ...
Страница 19: ...Chapter 1 Preparation of Embroidery Machine ...
Страница 60: ...BES 961BC BES 1261BC 58 Chapter 2 Embroidering Procedures ...
Страница 78: ...BES 961BC BES 1261BC 76 Chapter 3 Selection of Data and Embroidering ...
Страница 118: ...BES 961BC BES 1261BC 116 Chapter 5 Setting ...
Страница 119: ...Chapter 6 Operation of Machine ...
Страница 130: ...Chapter 6 Operation of Machine BES 961BC BES 1261BC 128 ...
Страница 131: ...Chapter 7 Maintenance ...
Страница 140: ...Chapter 7 Maintenance BES 961BC BES 1261BC 138 ...
Страница 141: ...Chapter 8 Standard Adjustment ...
Страница 153: ...Chapter 9 List of Error Messages ...
Страница 161: ...Connection and Installation of Optional Equipment ...
Страница 164: ...INSTRUCTION MANUAL BROTHER INDUSTRIES LTD NAGOYA JAPAN Printed in Japan 155 961BC C61 S93961 102 1998 08 B 1 ...