
6
eVo
4&7
Inset
MS07
‐
11
11/07/11
BURNING
WOOD
IN
A
SMOKE
CONTROL
AREA.
The
eVolution
Inset
Wood
burning
stoves
have
been
testedby
GASTEC
under
the
PD6434
standard
and
have
passed
the
emission
requirements
for
exemption
under
the
Clean
Air
Act.
Subsequently
it
has
been
exempt
for
use
in
smoke
control
areas
when
burning
wood
only
Below
are
detailed
operation
techniques
that
must
be
adhered
to
at
all
times
when
burning
in
a
smoke
control
zone.
eVo
7
Inset
Refueling
The
refueling
procedure
adopted
for
the
PD6434
tests
allows
the
newly
charged
fuel
to
burn
with
the
door
set
on
the
latch
but
not
closed,
the
primary
control
set
fully
open
for
1
‐
2
minutes
and
the
secondary
air
set
in
the
required
positions
necessary
for
the
various
outputs.
After
1
‐
2
minutes,
with
the
logs
burning
well,
the
door
and
primary
air
supply
needs
to
be
closed
but
the
secondary
air
control
position
can
remained
unaltered.
The
tertiary
air
supply
is
maintained
with
its
permanent
opening
throughout.
Ignition
The
procedure
adopted
for
ignition
is
to
build
a
bed
of
embers
in
stages
with
the
objective
of
warming
the
stove
as
quickly
as
possible.
Firstly,
a
double
‐
handful
of
kindling
(equivalent
to
the
weight
of
about
1
kg)
should
be
lit
with
chemical
firelighters.
The
primary
air
and
secondary
air
controls
must
be
fully
open
at
this
stage.
The
fire
‐
door
needs
to
be
pushed
against
the
latch
but
not
closed,
leaving
a
gap
of
a
few
millimeters.
After
about
8
minutes,
with
the
fire
bed
dying
back,
3
half
‐
sized
logs
(total
weight
about
1.2
kg)
should
be
added
with
the
air
controls
unaltered.
After
approximately
a
further
2
minutes,
when
these
logs
are
well
alight
the
door
and
primary
air
supply
can
be
closed.
Then
allow
the
fire
to
burn
down
to
embers
with
the
secondary
air
supply
maintained
at
maximum,
at
which
point
the
ignition
sequence
is
deemed
to
have
ended.
eVo
4
Inset
Refueling
There
is
a
requirement
for
the
door
to
be
left
ajar
for
3
minutes
immediately
after
refuelling.
This
is
to
ensure
that
flames
are
well
‐
established
on
the
newly
charged
logs
and
that
they
become
fully
blackened.
Additionally,
for
medium
and
low
output
burning,
the
Secondary
air
control
must
be
maintained
at
100%
open
for
the
first
3
minutes
after
refuelling
at
which
time
it
is
possible
to
adjust
to
the
required
settings
as
identified
above.
The
primary
air
intake
is
not
required
at
this
stage.
Содержание eVolution 4
Страница 16: ...eVo 4 7 I Inset MS07 11 SUMMARY OF FLUE PRO OBLEMS 11 0 16 07 11...
Страница 20: ...20 eVo 4 7 Inset MS07 11 11 07 11 STEP 2 STEP 3...
Страница 21: ...21 eVo 4 7 Inset MS07 11 11 07 11 STEP 4 STEP 5...
Страница 23: ...23 eVo 4 7 Inset MS07 11 11 07 11 STEP 1 STEP 2...
Страница 24: ...24 eVo 4 7 Inset MS07 11 11 07 11 STEP 3 STEP 4...
Страница 25: ...25 eVo 4 7 Inset MS07 11 11 07 11 STEP 5 STEP 6...
Страница 26: ...26 eVo 4 7 Inset MS07 11 11 07 11 STEP 7 STEP 8...
Страница 31: ...31 eVo 4 7 Inset MS07 11 11 07 11 eVo 4 Inset Dimensions...
Страница 32: ...32 eVo 4 7 Inset MS07 11 11 07 11 eVo 7 Inset Dimensions LIMITED WARRANTY...