Installation and Operation Manual
X-PR-IPS122-eng
Part Number 541B150AAG
January, 2011
IPS122 Series
2-1
Section 2 Installation
2-1 General
This section provides installation instructions for the Brooks
®
IPS122 Series
Indicating Pressure Switch devices . Refer to Section 1 of this manual for
dimensions and process connections.
2-2 Receipt of Equipment
When the instrument is received, the outside packing case should be
checked for damage incurred during shipment. If the packing case is
damaged, the local carrier should be notified at once regarding his liability. A
report should be submitted to your nearest Product Service Department.
Brooks Instrument
407 W. Vine Street
P.O. Box 903
Hatfield, PA 19440 USA
Toll Free (888) 554 FLOW (3569)
Tel (215) 362 3700
Fax (215) 362 3745
E-mail: [email protected]
www.BrooksInstrument.com
Brooks Instrument
Brooks Instrument
Neonstraat 3
1-4-4 Kitasuna Koto-Ku
6718 WX Ede, Netherlands
Tokyo, 136-0073 Japan
P.O. Box 428
Tel +81 (0) 3 5633 7100
6710 BK Ede, Netherlands
Fax +81 (0) 3 5633 7101
Tel +31 (0) 318 549 300
Email: [email protected]
Fax +31 (0) 318 549 309
E-mail: [email protected]
Remove the envelope containing the packing list. Carefully remove the
instrument from the packing case. Make sure spare parts are not discarded
with the packing materials. Inspect for damaged or missing parts.
2-3 Recommended Storage Practice
If intermediate or long-term storage of equipment is required, it is
recommended that the equipment be stored in accordance with the following:
a.
Within the original shipping container.
b.
Ambient temperature 21°C (70°F) nominal, 79°C (175°F) maximum
-29°C (-20°F) minimum.
c.
Relative humidity 45% nominal, 60% maximum, 25% minimum.