FT1-SB System Manual
MA370 Iss. 2
13
4 INSTALLATION AND COMMISSIONING
This chapter provides the installation and commissioning guidelines. The installation and the
commissioning of Brooks FT1-SB shall be carried out in accordance of AS3000. The block wiring
diagram of FT1-SB is shown in Figure 6 below.
I
+
47
K
+
-
DET.
C
680
DET.
POWER SUPPLY
24V / 1A
A
N
V+
V-
PO
WER
MCP
EOL
3K9
24
V
0V
24V
24V
0V
0V
TX
TX
RX
RX
DI
SP
LAY
DE
TE
CT
OR
SUB930
SUB931/931S/932
FT1 - SB
DISPLAY MODULE
FT1 - SB
CONTROL MODULE
240V AC
NO
NC
COM
NO
NC
COM
NO
COM
NC
NO
COM
NC
NO
COM
NC
DISABLE
CONTACT RATING
0.5A @ 24V DC
24VDC / 0.5 Amp
SUPERVISED
CONTACT RATING
0.5A @ 24V DC
CONTACT RATING
0.5A @ 24V DC
CONTACT RATING
0.5A @ 24V DC
CONTACT RATING
5A @ 24VDC / 240VAC
ALARM
OUTPUTS
FAULT
OUTPUTS
N
Figure 6 FT1-SB Block Wiring Diagram
4.1 Installation
4.1.1 FT1-SB Installation
1. The control / termination module and the power supply are designed to be DIN rail mounted.
It can be installed at a convenient location within the switchboard cabinet and connected to
the display module via 4 core cable as sown in Figure
2. The display module is to be mounted via a standard 90x90mm square cut out on the
front door of a switch board. Please refer to the mechanical drawing of the system
cabinet as shown in Figure 8.
3. Before the installation is completed, check and secure all the electrical connections.