14 December 2010
Due to continued product improvement, Broady’s reserves the right to change product specifications without prior notification.
All Dimension are in mm………….Copyright ©
20
PROCEDURE FOR THE TEST AND COMISSIONING OF YOUR DECORATIVE FIRE.
Ensure Gas Supply and the Power Supply (caution 240V) to the Unit.
•
Refer to Data Plate on this Specification for settings. The Data Plate is attached to the under carriage of
the Burner .
•
Remove Front Grate ensure the CAT5 cable to the Control Receiver is still connected.
•
Loosen the Jet Test point and attach manometer (Digital is preferred). The Test Point is on the Right
Hand Side of the Gas Burner , as Shown Below .
•
Light Appliance, adjust to High Flame setting and check pressure, adjust to Low Flame and check pres-
sure.
NOTE : If setting the Pressure is required it is to be carried out by a Certified Gas Fitter.
•
If adjustments are necessary, remove the cap . The Pressure Adjustment Screw and Nut are on the
Front Side of the Gas Control Valve (shown in Diagram
B
in this specification) and are
Factory
set.
High Pressure Setting
: Set the modulator to Maximum Condition. Screw in “Nut A” to Increase the Outlet
Pressure then screw “Nut A” out to Decrease the Pressure to the desired settings . Use 10mm spanner.
Low Pressure Setting:
Turn Off the Power to the Modulator (by disconnecting the Modulator Harness Connec-
tion at the Valve - See Wiring Diagram in Page 17 .) and, keep Nut A stationary . Use a screwdriver to screw in
“Screw B” to Increase the Pressure and Screw it Out to Decrease the Pressure . Carefully replace the Modula-
tor Plastic Cap .
WARNING:
To ensure the Correct Operation of the Modulator it is necessary that the Plastic Cap is returned to
its original location .
Gas Test Nipples
for SG / EG Fires