Service Manual 32 – Contour 3 Series, Profiler & Advance – Approved Issue 5 Printed 2/13/2014 11:50:17 AM
61
Cooler Operation
(cont.)
Pump Operation
(cont.)
Pump will not operate
•
Check that the pump is switched ON and that the pump is not in an operation
delay period i.e. water contact across Trident probes or Servoseal open time.
•
Check for 240 Volt output to the pump, at the
PUMP-NEUTRAL
and
PUMP-
ACTIVE
terminals on the pump.
OFF
10 A
V
COM
FUSED
1000V- - -
750V
V
VOLTS
Multimeter
240
PUMP - NEUTRAL
PUMP - ACTIVE