RSC ACTIVITY
Change
Appropoate
EX1ension
A.S.U
CPE/MS 5
2
6
Issue
2 (12/88)
_J
Part 7 MAINTENANCE
Check All
AS U.s and
Ribbon Cables
Plugged 1n
Mains fail
Relays Released
NO
NO
Check Exchange
Lines, E:r;timsion
Cabling, Check All
fatensions
Plugged in
Is
Fault
RTNR, No
hold on recall
No rec.
Earth
NO
YES
Turn of'f Power
Check all AS.U
Plugged in
Restore Power
Fig
7.1
FAULTING FLOW CHART
Change
Complete
System
YES
Clear or
Change unit
as necessary
7.5
Содержание Senator
Страница 1: ......
Страница 2: ......
Страница 3: ...British 1 EL ECO System manual ...
Страница 6: ...SENATOR SWITCHING SYSTEM iv CPE MS 526 Issue 2 12 88 ...
Страница 8: ...Part 1 GENERAL DESCRIPTION 1 2 CPE MS 526 Issue 2 12 88 ...
Страница 10: ...Part 2 INSTALLATION 2 2 CPE MS 526 Issue 2 12 88 ...
Страница 22: ...Part 3 THE TERMINAL 3 2 CPE MS 526 Issue 2 12 88 ...
Страница 26: ...Part 4 COMMISSIONING PROCEDURES 4 2 CPE MS 526 Issue 2 12 88 ...
Страница 28: ...5 2 Part 5 FACILITIES AND OPERATING PROCEDURES CPE MS 526 Issue 2 12 88 ...
Страница 37: ...Part 7 MAINTENANCE 7 2 CPE MS 526 Issue 2 12 88 ...
Страница 43: ...Part 7 MAINTENANCE 7 8 CPE MS 526 Issue 2 12 88 ...
Страница 45: ...Part 8 HOW IT WORKS 8 2 CPE MS 526 Issue 2 12 88 ...
Страница 47: ...9 2 Part 9 PARTS LIST OF CURRENT EQUIPMENT FOR SENATOR CPE MS 526 Issue 2 12 88 ...
Страница 49: ...Part 10 AUXILIARY EQUIPMENT 10 2 CPE MS 526 Issue 2 12 88 ...
Страница 69: ...Part 11 DOCUMENTATION 11 2 CPE MS 526 Issue 2 12 88 ...
Страница 71: ...Part 12 SPECIFICATION 12 2 CPE MS 526 Issue 2 12 88 ...
Страница 72: ...Part 12 SPECIFICATION 12 3 CPE MS 526 Issue 2 12 88 ...
Страница 73: ...Part 12 SPECIFICATION 12 4 CPE MS 526 Issue 2 12 88 ...
Страница 74: ......
Страница 75: ......