CONTENTS
1.
General
2.
Capacities, sizes and weights
3.
Installation
3.1
Location of the CCU
3.2
Installing the CCU
3.3
Cabling and wiring
3.3.1
Connecting the exchange lines
3.3.2
Connecting the extensions
3.3.3
Functional earth connection
3.3.4
Connecting the mains supply
3.4
Installing the key modules and telephones
3.4.1
Numbering the extension keys
3.5
Setting the option switches
3.6
Telephones
3.6.1
Telephone signalling
3.6.2
Approved telephones
3.7
Extension bells
3.8
Installation and system facilities
3.8.1
Mains fail connection and exchangeline ringing
3.8.2
Divert
3.9
Testing
4.
Supervisory signals
4.1
Ringing signals
4.2
Lamp signals
4.3
Tones
5.
Facilities
5.1
Facilities list
5.2
Facilities description
5.2.1
Intercom
5.2.2
Incoming exchange call
5.2.3
Outgoing exchange call
5.2.4
Exchange line hold
5.2.5
Enquiry
5.2.6
Call transfer
5.2.7
Conference
5.2.7.1
Exchange line conference
5.2.7.2
Internal conference
5.2.8
Call diversion
5.2.9
Programming exchange ringing
5.2.10
Exclusive line facility
5.2.11
Two wire extensions
5.2.12
Systems connected to a PBX
5.2.13
Power fail
6.
Maintenance
6.1
General
6.2
Test conditions
6.3
Fault location and rectification
6.3.1
Changing the CCU
6.3.2
Transportation
Page
3
of
33
Содержание ESCORT
Страница 1: ...ESCORT 2 6 ...
Страница 2: ......
Страница 3: ...BRITISH TELECOM CUSTOMER PREMISES EQUIPMENT E S C 0 R T S Y S T E M MA NUAL Page 1 of 33 ...
Страница 36: ......