57-DVRS50
20
1.
Hang the left and right side back panel onto the bracket in the
back of the firebox. Align with the far outside edge of the
bracket.
2.
Hang the center back panel onto the bracket and slide the two
outside panels in until they touch the center panel.
Rear Panel Installation Instructions
Side Panel & Baffle Installation Instructions
Set the right and left side
panels by inserting the tabs
into the slot of the support
plate. Panel s should angle
into the firebox (as shown)
Set the baffle on top of the side
panel so the slot in the baffle
sets over the tab on the side
panel.
Small holes to the back
The side panels are secured
thru the side of the firebox
Содержание 57-DVRS50
Страница 8: ...57 DVRS50 8 APPLIANCE DIMENSIONS Surround Removed Surround Attached...
Страница 27: ...57 DVRS50 27 REMOTE CONTROL SETUP AND OPERATION future option...
Страница 28: ...57 DVRS50 28 REMOTE CONTROL SETUP AND OPERATION cont Future Option N A on this unit...
Страница 29: ...57 DVRS50 29 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 30: ...57 DVRS50 30 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 31: ...57 DVRS50 31 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 33: ...57 DVRS50 33 REMOTE CONTROL SETUP AND OPERATION cont...
Страница 35: ...57 DVRS50 35 CONVERSION KIT INSTRUCTIONS con t Step 7 Valve Conversion...
Страница 39: ...57 DVRS50 39 WIRING SCHEMATICS Figure 25...
Страница 42: ...57 DVRS50 42 NOTES...
Страница 45: ...ARCHGARD INDUSTRIES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...