Bridgeview Manufacturing Inc.
20
PTO/Driveline
Frequent lubrication is required. Grease the driveline parts as required on the chart.
After storage
for long periods of time, lubricate and check the function of every
driveline component before operating.
Failure to grease all the joints will
VOID
warranty.
Gearbox
There is one grease zerk on the front of the gear box.
Apply 3-5 pumps of good quality grease every 8 hours
or 150 bales, whichever comes first.
If the gearbox is removed to replace the rotor or
perform any other service, add
80 pumps
of grease to
the grease zerk upon reinstallation.
The gear box requires GL5 80W90 gear oil. The oil should be filled to the level plug and
checked on a regular basis.
Oil change interval
•
25 hours after first use
•
50 hours after first use
•
Every 300 hours or annually (whichever comes first)
Содержание BALE KING 8200
Страница 30: ...Bridgeview Manufacturing Inc 27 ...
Страница 37: ...Bridgeview Manufacturing Inc 34 Gearbox ...
Страница 42: ...Bridgeview Manufacturing Inc 39 Upper Tub Components ...
Страница 46: ...Bridgeview Manufacturing Inc 43 Deflector Hose Cover ...
Страница 55: ...Bridgeview Manufacturing Inc 52 ELECTRICAL HYDRAULIC SCHEMATICS Diverter Controls ...
Страница 56: ...Bridgeview Manufacturing Inc 53 Lights ...
Страница 57: ...Bridgeview Manufacturing Inc 54 ...
Страница 58: ...Bridgeview Manufacturing Inc 55 ...
Страница 61: ...Bridgeview Manufacturing Inc 58 ...
Страница 62: ...Bridgeview Manufacturing Inc 59 ...