3-24
Maintenance
L. To assemble cone:
1. Dismantle guard (Figs. J
1
- J
3
). Remove old cone (e.g. cut
open with knife). Take off chain. Place neck of new cone in
hot water (approx 80
o
C / 180
o
F) and pull onto bearing housing
(Fig. L
1
).
2. Turn guard cone into assembly position (Fig. L
2
). Further
assembly instructions for guard (Figs. K
1
- K
5
).
3. Reconnect chain if required (Fig. L
3
).
L1
L2
L3
250968L
REVISED 061107-12
Содержание Corner Auger 1080
Страница 14: ...1 8 NOTES ...
Страница 36: ...2 22 Operation REVISED 041608 15 NOTES ...
Страница 47: ...3 11 Maintenance Fig 13 OM04303 Revised 041608 15 ...
Страница 57: ...3 21 Maintenance NOTES ...
Страница 69: ...3 33 Maintenance HYDRAULIC SYSTEM ...
Страница 72: ...3 36 Maintenance NOTES ...
Страница 92: ...4 20 Initial Set up NOTES ...
Страница 106: ...5 14 280909 MODEL 880 1080 ELECTRICAL Revised 082307 13 013108 14 ...
Страница 108: ...5 16 NOTES ...
Страница 110: ...5 18 280907 MODEL 880 1080 AUGER ...
Страница 116: ...5 24 MODEL 880 1080 HYDRAULICS Revised 092606 10 ...
Страница 126: ...5 34 MODEL 880 1080 SCALE UNIT OPTIONAL Revised 082307 13 280901 SCALE LAYOUT ...
Страница 128: ...5 36 251914 Revised 082407 13 013108 14 MODEL 880 1080 AGRICOVER TARP Optional ...
Страница 130: ...5 38 Revised 013108 16 251914 MODEL 880 1080 WEATHER GUARD TARP Optional ...
Страница 138: ...MANUALS 280900 013108 14 081408 16 AUGUST 2012 17 www unverferth com ...