![brennenstuhl BRX 5000 Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/brennenstuhl/brx-5000/brx-5000_user-manual_2807210034.webp)
7. GES and its subcontractors shall not be liable to any extent
whatsoever for any actual, potential or assumed loss of profits or
revenues or for any collateral costs that may result from any loss
or damage to Exhibitor’s materials which may make it impossible
or impracticle to exhibit same.
8. Claims for loss or damage must be submitted to GES by the
close of the show. No suit or action shall be brought against
GES or its subcontractors more than one year after the cause of
action.
9. The Exhibitor agrees, in connection with the receipt,
handling, temporary storage and reloading of its materials, that
GES and its subcontractors will provide these services as
Exhibitor’s agent and not as bailee or shipper. If any employee
of GES or its subcontractors shall sign a delivery receipt, bill of
lading or other document, we agree that GES or its subcontractor
will do so as the Exhibitor’s agent, and the Exhibitor accepts the
responsibility thereof.
10. GES and its subcontractors shall not be liable for shipments
received without receipts, freight bills or specified unit counts on
receipts or freight bills, such as a courier or van lines. Such
shipments will be delivered to booth without guarantee of piece
count or condition.
11. Empty container labels will be available at the GES Service
Centre. Affixing the labels is the sole responsibility of the
Exhibitor or its representative. It is understood that these labels
are used for EMPTY STORAGE ONLY, and GES and its
subcontractors assume no responsibility for loss or damage to
contents while containers are in storage or for mislabelled
containers.
13. The Exhibitor agrees, in the event of a dispute with GES or
its subcontractors relative to any loss or damage to any of your
materials or equipment, that the Exhibitor will not withhold
payment in any amount due to GES for material handling
services or any other services provided by GES or its
subcontractors as an offset against the amount of the alleged
loss or damage. Instead, the Exhibitor agrees to pay GES prior
to the close of the show for all such charges and further agrees
that any claim the Exhibitor may have against GES or its
subcontractors shall be pursued independently by the Exhibitor
as a completely separate transaction to be resolved
on its own merits.
12. In order to expedite removal of materials from the show site,
GES shall have the authority to change designated carriers, if
such carriers do not pick up on time. Where no dispostion is
made by the Exhibitor, materials will be taken to a warehouse to
await Exhibitor’s shipping instructions, and the Exhibitor agrees
to be responsible for payment of charges relating to such
handling at the warehouse. GES assumes no liability as a result
of such re-routing or handling.
1. GES CANADA Exposition Services herein known as GES
and its subcontractors shall not be responsible for damage to
uncrated materials; materials improperly packed, glass
breakage or concealed damage.
2. Relative to inbound shipments, there may be a lapse of
time between the delivery of shipment(s) to the booth by GES
or its subcontractors and the arrival of the Exhibitor’s
representative at the booth. Similarly, relative to outgoing
shipment(s), it is possible that there will be a lapse of time
between the completion of packing and the actual pick-up of
materials from the booth for loading onto a carrier. It is
understood that during such times the shipment(s) will be left
in the booth unattended.
Therefore, it is agreed that GES and its subcontractors are
not responsible for the loss or disappearance of Exhibitor’s
materials after the same have been delivered to Exhibitor’s
booth, nor are GES and its subcontractors responsible for
Exhibitor’s materials before they are picked up from the
Exhibitor’s booth for loading after the show. Consequently,
all bills of lading covering outgoing shipment(s) submitted to
GES or its subcontractors by Exhibitor will be checked at the
time of pick-up from the booth and corrected where
discrepancies exist.
3. GES and its subcontractors shall not be held liable for any
damage incurred during the handling of equipment requiring
special devices to properly load, place or reload unless
advance notice has been given to GES in time to obtain the
proper equipment.
4. GES and its subcontractors shall not be responsible for
loss, delay or damage due to strikes, lockouts or work
stoppages of any kind.
6. It is understood that GES and its subcontractors are not
insurers. Insurance, if any, shall be obtained by the Exhibitor.
Amounts payable to GES hereunder are based on the scope
of the liability as herein set forth and are unrelated to the value
of the Exhibitor’s property. It is further understood and agreed
that GES and its subcontractors do not provide for full liability
should loss or damage occur. It is agreed that if GES or its
subcontractors should be found liable for loss or damage to
Exhibitor’s equipment, the liability shall be limited to the specific
article that was physically lost or damaged. Such liability shall
be limited to a sum equal to $0.30 per pound per article, with a
maximum liability of $50.00 per item or $1,000.00 per
shipment, whichever is less, as agreed upon damages and
exclusive remedy. Provisions of this paragraph shall apply if
loss or damage, regardless of cause or origin, results directly
or indirectly to property through performance services to
5. GES and its subcontractors shall not be responsible for
ordinary wear and tear in handling of equipment, nor for loss
or damage due to fire, theft, windstorm, water, vandalism,
acts of God, mysterious disappearance or other causes
beyond their control.
Exhibitor’s or from negligence, active or otherwise, by GES, its
subcontractors or their employees.
LIMITS OF LIABILITY
& RESPONSIBILITY
Be sure your materials are insured
from the time they leave your firm until they are returned after the show. It is suggested that
Exhibitors arrange all risk coverage. This can usually be done by riders to existing policies. Contact your insurance representative.
Be sure your liability insurance is in effect during transit and return of your materials, during storage and at show site.
The consignment or delivery of a shipment to GES or its subcontractors by an Exhibitor or by any shipper on behalf of the
Exhibitor shall be construed as an acceptance by such Exhibitor (and/or other shipper) of the terms and conditions set forth
in Sections 1 through 13 above.
#3030, 2600 Portland St. SE, Calgary, Alberta, T2G 4M6 Tel: 403-243-2212 Fax: 403-243-3868 Toll Free: 1-800-636-8235 www.gesex po.ca
Содержание BRX 5000
Страница 1: ......
Страница 15: ......
Страница 16: ...furnishings Note Items may differ from city to city ...
Страница 17: ...furnishings Note Items may differ from city to city ...
Страница 19: ...specialty furniture ...
Страница 20: ...specialty furniture ...