Page 12
750
Cycles
1500
Cycles
Maintenance and Lubrication Schedule
Apply grease (synthetic) to contact areas between
inner/outer fold arms. See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Apply Light Oil - See Lubrication Diagram
Correct, replace damaged parts and/or relubricate.
See Lubrication Diagram.
Resecure, replace or correct as needed. See
Platform Angle Instructions and Tower Microswitch
Adjustment Instructions.
Replace damaged parts.
Resecure, replace or adjust as needed. See
Microswitch Adjustment Instructions.
Realign towers and vertical arms. Lubricate or
correct as needed.
Inner/outer fold arms (2)
Platform pivot pin bearings (4)
Inner fold arm bearings (8)
Inner roll stop pivot bearings (2)
Inner roll stop lever bearings (2)
Inner roll stop lever slot (2)
Saddle support bearings (8)
Outer fold arm roller pin bearings (4)
Outer fold arm cam followers (4)
Parallel arm pivot pin bearings (16)
Handrail pivot pin bearings (4)
Hydraulic cylinder pivot bushings (8)
Inspect Lift-Tite
™
latch rollers for wear or damage,
positive securement and proper operation (2)
Inspect inner roll stop for:
• Wear or damage
• Proper operation. Roll stop should just rest on
top surface of the threshold plate.
• Positive securement (both ends)
Inspect handrail components for wear or damage,
and for proper operation
Inspect microswitches for securement and proper
adjustment.
Make sure lift operates smoothly
continued
continued
Perform all procedures listed in previous section also
Correct or replace damaged parts.
Correct or replace damaged parts and/or relubri
-
cate. See Lubrication Diagram
See Platform Fold Pressure Adjustment
See Certification Checklist Diagnostic Procedures
Correct as needed.
Correct as needed.
Inspect outer barrier for proper operation
Inspect outer barrier latch for proper operation,
positive securement, and detached or missing
spring(s)
Adjust fold pressure
Verify FMVSS 403/404 Certification Checklist
Inspect lift for wear, damage or any abnormal
condition
Inspect lift for rattles
Содержание Century 2
Страница 11: ...Page 9 NOTES This page intentionally left blank...
Страница 37: ...Page 35 NOTES This page intentionally left blank...