background image

703739-1   Revision D   Spider Glazier 2200 Operator's Manual   Issue Date: 2019-Jan-25

Page 6 of 27

2. 

OSHA CFR 29 REGULATIONS

Selected portions of OSHA Code of Federal Regulations Title 29 have been reproduced in this section for the 

convenience of Spider Glazier 2200 users.  Spider assumes no responsibility for the accuracy, completeness, or 

currentness of the regulations quoted.  Obtain additional regulations from the nearest office of the Department 

of Labor.  

a)  1926 Subpart C:  General Safety and Health Provisions, Standard 1926.20: General 

Safety and Health Provisions

(a) Contractor Requirements

1.  Section 107 of the Act requires that it shall be a condition of each contract which is entered into 

under legislation subject to Reorganization Plan Number 14 of 1950 (64 Stat. 1267), as defined 

in 1926.12, and is for construction, alteration, and/or repair, including painting and decorating, 

that no contractor or subcontractor for any part of the contract work shall require any laborer or 

mechanic employed in the performance of the contract to work in surroundings or under working 

conditions which are unsanitary, hazardous, or dangerous to his health or safety.

(b) Accident-prevention Responsibilities

1.  It shall be the responsibility of the employer to initiate and maintain such programs as may be 

necessary to comply with this part.

2.  Such programs shall provide for frequent and regular inspections of the job sites, materials, and 

equipment to be made by competent persons designated by the employers.

3.  The use of any machinery, tool, material, or equipment that is not in compliance with any 

applicable requirement of this part is prohibited. Such machine, tool, material, or equipment shall 

either be identified as unsafe by tagging or locking the controls to render then inoperable or shall 

be physically removed from its place of operation.

4. 

The employer shall permit only those employees qualified by training or experience to operate 

equipment and machinery.

b)  1926 Subpart C: General Safety and Health Provisions, Standard 1926.21 Safety 

Training and Education

(a) General Requirements

1.  The Secretary shall, pursuant to Section 107(f) of the ACT, establish and supervise programs 

for the education and training of employers and employees in the recognition, avoidance and 

prevention of unsafe conditions in employments covered by the act.

Содержание SPIDER GLAZIER 2200

Страница 1: ...Drive Seattle WA 98188 Phone 877 774 3370 Fax 206 575 6240 Email Spider SpiderStaging com Website SpiderStaging com 703739 1 Revision D Spider Glazier 2200 Operator s Manual Issue Date 2019 Jan 25 OP...

Страница 2: ...perate this equipment Any operation in violation of these instructions is at the operator s own risk and may result in serious injuries Keep this manual with the equipment at all times Use only spare...

Страница 3: ...nd Disposal Standard 1926 251 Rigging Equipment for Material Handling 8 f 1926 Subpart M Fall Protection Standard 1926 501 Duty to have Fall Protection 8 g 1926 Subpart N Helicopters Hoists Elevators...

Страница 4: ...nual Issue Date 2019 Jan 25 Page 4 of 27 6 Transportation Storage Configuration a Configuring for Storage or Transportation 25 7 Wire Rope a Important Points to Note 26 b 30 Day Inspection 26 Wire Rop...

Страница 5: ...le from your Spider operations center It is the duty of the employer to provide each operator with a copy of this manual 3 Setup and use must comply not only with the instructions in this manual but a...

Страница 6: ...orking conditions which are unsanitary hazardous or dangerous to his health or safety b Accident prevention Responsibilities 1 It shall be the responsibility of the employer to initiate and maintain s...

Страница 7: ...iveandLifeSavingEquipment Standard1926 104 Safety Belts Lifelines and Lanyards a Lifelines safety belts and lanyards shall be used only for employee safeguarding Any lifeline safety belt or lanyard ac...

Страница 8: ...nal fall arrest system If a guardrail system is chosen to provide the fall protection and a controlled access zone has already been established for leading edge work the control line may be used in li...

Страница 9: ...t No Riders Allowed ii No person shall be allowed to ride on material hoists except for the purposes of inspection and maintenance h 1926 Subpart R Steel Erection Standard 1926 760 Fall Protection a G...

Страница 10: ...be positioned at 18 in 33 in and 48 in from leading edge of front gantry base Flexible Easy to position Adjustable Tieback Uses reliable secure Dual Lift Inclination Safety Lock suspended from shackl...

Страница 11: ...2200 Angle Brace Front Gantry Rear Gantry Wire Winder Hoist Counterweights Outreach Backspan Top Limit Switch Striker Plate Hinges Steering Handle Thimble Outreach Tilt Support Tieback Locking Device...

Страница 12: ...that the Caster Brakes are on the side of the Rear Gantry that will face the Front Gantry inboard side Leave Rear Gantry Caster Brakes unlocked at this point Step 3 Remove pin from outboard shackle o...

Страница 13: ...Hinge forward of the Front Gantry Step 5 Use the Steering Handle to maneuver the Rear Gantry into position and lift the other end of the Backspan to the top of the Rear Gantry Refer to Figure 6 for po...

Страница 14: ...as shown in Figure 8 Step 2 Remove the nuts and washers from the flanged end of the Angle Brace Rotate the flanged end of the Angle Brace up to the Backspan and reinstall the nuts and washers on the e...

Страница 15: ...the tie wrap holders attached to the Outreach and Backspan Step 4 Pivot the Outreach up so that the upper holes in the Outreach Hinges line up with the upper holes in the Backspan Hinges Step 5 Insert...

Страница 16: ...rweight so that post is toward the opposite end of the slot from the first counterweight as shown in Figure 13 Step 4 Continue to load counterweights offsetting them from one another to minimize pinch...

Страница 17: ...pan as shown in Figure 14 Step 2 Install Sling Link on Shackle Step 3 Loop second 5 8 Shackle through Sling Link and bolt Tieback Locking Device Bracket to Shackle Step 4 Bolt Tieback Locking Device t...

Страница 18: ...o the structure face two tiebacks without slack shall be attached to each rope supporting device to prevent movement in any direction Step 3 Attach the tieback to the Spider Glazier 2200 at the Tiebac...

Страница 19: ...four 1 2 inch screws that attach both Hoist Brackets to the Backspan Insert the four 1 2 inch screws upwards through the holes in the top of the Hoist Brackets as shown in Figure 17 Secure each 1 2 in...

Страница 20: ...hoist s rope drive refer to Figure 19 Insert the brackets for the Wire Winder Entrance Tube into the square hole in the side of the Hoist Rope Drive see Figure 19 Insert M16 screw into Stirrup hole a...

Страница 21: ...you feel the traction roller inside grip it 5 Run the Hoist in the UP direction to send the wire rope all the way through the Hoist Rope Drive and 6 Directly into the Wire Winder Entrance Tube Step 3...

Страница 22: ...hts The rated load of 2 000 lb can be lifted from each configuration with the correct number of counterweights Refer to Table 1 below for the correct number of counterweights to use for each of the di...

Страница 23: ...25 Page 23 of 27 25 counterweights Flat Inner Configuration Flat Mid Configuration Flat Outermost Configuration Figure 24 Configurations with the Outreach in Flat Position a Flat Configurations Refer...

Страница 24: ...24 of 27 Raised Inner Configuration Raised Mid Configuration Raised Outermost Configuration Figure 25 Configurations with the Outreach in Raised Position b Raised Configurations Refer to Table 1 on P...

Страница 25: ...the wire rope Step 2 Unplug the Limit Switch if plugged into the Hoist Control Box and put some slack into the Limit Switch power cord Zip tie the Limit Switch Shackle to the shroud or otherwise prot...

Страница 26: ...ength of wire rope provided with the Spider Glazier 2200 is 300 feet b 30 Day Inspection The wire rope should be examined by a person who is known to be trained and knowledgeable and able to determine...

Страница 27: ...ire Rope Location on Wire Rope Reduction of 0156 in of the diameter record measured diameter and location 6 Broken wires in 1 rope lay 3 broken wires in 1 rope lay Excessive wear of 1 3 of outside wir...

Отзывы: