background image

P.O. Box 309, Menomonee Falls, WI  USA  53052-0309
PHONE 800.BRADLEY (800.272.3539)  FAX 262.251 5817
bradleycorp.com

Installation 

215-1812 Rev. A; ECN 14-03-005B

© 2014 Bradley

Page 1 of 5 

7/1/2014

ABP-1C Single Valve 

Ablution System

S67-610 1C ABP Single Compression 

Valve (SV)

S67-609 1C ABP Single Compression 

Valve with Lever (SVL)

Table of Contents

Rough-Ins   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 2–3
Installation  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 4
Cleaning and Maintenance   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5

IMPORTANT!

Read this entire installation manual to ensure proper installation. When finished with the 
installation, file this manual with the owner or maintenance department. Compliance and 
conformity to local codes and ordinances is the responsibility of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding packaging material. If any parts are missing, do not begin installation until 
you obtain the missing parts.

Make sure that all water supply lines have been flushed and then completely turned off 
before beginning installation. Debris in supply lines can cause valves to malfunction.

Product warranties may be found under “Products” on our web site at  
www.bradleycorp.com.

Installation

THIS

SIDE

UP

Packing List

SV Valve

SVL Valve

Содержание S67-610

Страница 1: ... with the installation file this manual with the owner or maintenance department Compliance and conformity to local codes and ordinances is the responsibility of the installer Separate parts from packaging and make sure all parts are accounted for before discarding packaging material If any parts are missing do not begin installation until you obtain the missing parts Make sure that all water supp...

Страница 2: ... 127mm 1 7 16 37mm 1 5 8 42mm 4 1 2 115mm 1 1 2 39mm 3 4 20mm 3 77mm 3 1 4 83mm 1 2 NPT Inlets and Outlets 1 2 NPT Handle Sleeve Escutcheon Note orientation of Sleeve Note Sleeve rotated 180 from standard installation Ø 1 1 2 hole required Escutcheon Outline Escutcheon Outline Wall opening outline Optional Stop 3 1 4 standard installation rough in 2 1 2 alternate installation rough in Rough in Sin...

Страница 3: ...mm 1 5 8 42mm 4 1 2 115mm 1 1 2 39mm 3 4 20mm 3 77mm 3 1 4 83mm 1 2 NPT Inlets and Outlets 1 2 NPT Handle Sleeve Escutcheon Note orientation of Sleeve Note Sleeve rotated 180 from standard installation Escutcheon Outline Escutcheon Outline Wall opening outline Optional Stop 3 3 8 to 4 standard installation rough in 2 3 8 to 3 3 4 alternate installation rough in Rough in Single Valve with Lever Han...

Страница 4: ... Optional ABL Spout Quick Connect Kit S45 2848 3 8 NPT Outlet 3 8 NPT Outlet Frame Optional 1C Spout SSPS Shown SX assembled in the same manner Optional 1C Spout SSPS Shown SX assembled in the same manner Model SVL Shown Model SV is assembled in teh same manner Model SVL Shown Model SV is assembled in teh same manner A Connect valve to supply line and spout or diverter Valve must be held in place ...

Страница 5: ...high quality stainless steel cleaner and polish in accordance with the manufacturer s instructions Many of these products leave a protective coating that helps prevent future smears and fingerprints Grease and Oil To remove grease and oil use a quality commercial detergent or caustic cleaner Apply in accordance to the manufacturer s instructions and in the direction of the polish lines Precautions...

Отзывы: