background image

2

S19-876 Installation

1/12/11 

Bradley Corporation • 215-1279 Rev. C; ECM 10-05-011A

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it with the owner 
or maintenance department. Compliance and conformity to drain requirements and other local 
codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before discarding 
any packaging material. If any parts are missing, do not begin installation until you obtain the 
missing parts.

Flush the water supply lines before beginning installation and after installation is complete. Test 
the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at 
all times. Provisions shall be made to prevent unauthorized shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 
PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify proper 
operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained 
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.bradleycorp.com 
or call 1-800-BRADLEY. 
Product warranties and parts information may also be found under ”Products” on our web site at 
www.bradleycorp.com.

Installation

THIS

SIDE

UP

Packing List

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Содержание S19-876

Страница 1: ...bradleycorp com Installation 215 1279 Rev C ECM 10 05 011A 2011 Bradley Corporation Page 1 of 16 1 12 11 S19 876 Drench Hose Service Retrofit Kit for Heat Trace Showers Table of Contents Pre Installation Information 2 Installation 3 Assembly of Components 3 Service Parts List 3 Troubleshooting 4 ...

Страница 2: ...l be made to prevent unauthorized shutoff The ANSI Z358 1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI 0 21 MPa flowing pressure Flushing fluid should be tepid per ANSI Z358 1 The inspection and testing results of this equipment should be recorded weekly to verify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1...

Страница 3: ...hat the upper right plastic shell can be pulled away from the unit or removed completely NOTE Other components may have to be disassembled to remove the shell 2 Expose the pipe plug by partially removing the insulation and then remove plug 3 Connect the drench hose parts as shown using pipe sealant on the threads Do not secure the flag handle permanently at this time 4 Operate the valve to ensure ...

Страница 4: ...nd replace if check fails activates at 50 F 10 C factory set Defective freeze valve if the water temperature from the valve is above 45 F 7 C Replace the freeze valve NOTE A water supply that is at least 45 F 7 C or colder will hold the freeze bleed valve open To close the valve 1 turn the water off temporarily or plug the valve until the heat trace unit s heat warms the valve 2 increase the surfa...

Отзывы: