background image

2

S19-324D1

 Installation

6/11/2020 

Bradley • 

215-1848 Rev. G: ECO 20-05-028

WARNING

Power supplied to the unit should be between 90-264VAC, 50-60 Hz, 15 amp branch circuit with a 

dedicated circuit breaker or fuse and should not supply power to any other device. Compliance 

and conformity to local codes and ordinances is the responsibility  of the installer.

Do not use this safety equipment in a location that does not match its hazardous location rating. 

Verify the appropriate ratings prior to installation.

When making electrical connections be sure to follow all lockout–tagout safety procedures.

Flush the water supply lines before beginning installation and after installation is complete. Test 

the unit for leaks and adequate water flow. Main water supply should be “ON” at all times unless 

system is being serviced. Provisions shall be made to prevent unauthorized shutoff.

CAUTION

Supply the unit with clean, potable water.

NOTICE

Before installing this product, ensure that there are adequate clearances around the product and 

activation of the product does not interfere with other products or obstructions.

It is recommended that all water supply and electrical connections be made at temperatures above 

freezing. Failure to do so may result in major product and/or property damage.

Constant power supply to safety equipment is necessary for it to function.

Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with potable water 

after cleaning.

Содержание S19-324D1

Страница 1: ...n Proof Emergency Signaling System Table of Contents Pre Installation Information 2 3 Assembly of Components 4 Install the Flow Switch and Mount Signaling Assembly 5 Connect Signaling Assembly to Flow...

Страница 2: ...eginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall be...

Страница 3: ...require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment buil...

Страница 4: ...Sensor Body Brass Adapter and Tee 2 7 8 73mm 1 5 8 41mm NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 13 16 97mm 5 5 16 135mm Red Blue Black Remote Sensing 13 1 8 334mm System is...

Страница 5: ...m may be mounted directly to the drench shower piping using the supplied U bolts and nuts The signaling system can also be bolted to a flat surface such as a wall hardware for this type of installatio...

Страница 6: ...clockwise and sealing the control box The cable may be cut to any length required A Wire the flow switch to the control box with one of the provided cables and conduit hubs supplied per the wiring sch...

Страница 7: ...ill automatically reset the silence feature The signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The signaling system will continue to o...

Страница 8: ...that water flow is sufficient 2 4 gallons per minute is required Installation error Check all electrical connections including power supply at the quick connect cable from the signal station to the fl...

Страница 9: ...9 324D1 Bradley 215 1848 Rev G ECO 20 05 028 6 11 2020 S19 324D1 Service Parts 30 32 31 32 33 34 37 34 38 76 84 62 34 33 34 20 38 77 63 61 41 43 32 33 34 39 36 34 37 34 36 33 34 2 1 60 64 65 38 84 36...

Страница 10: ...Surface Mount 60 140 1157 1 Plate PM Pipe Mount 60 S70 176 1 Mounting Plate Heat Trace Item Part No Qty Description 61 160 514 5 Screw 3 8 16 x 1 0 BTNCA 62 161 157 5 Nut 3 8 16 Hex Jam 63 140 1158 1...

Отзывы: