background image

Installation 

P.O. Box 309

Menomonee Falls, WI 53052 USA

800 BRADLEY (800 272 3539)

+1 262 251 6000

bradleycorp.com

215-1846 Rev. C; ECN 17-05-068
© 2017 Bradley
Page 1 of 14 

11/21/2017

S19-323

NEMA 3R

S19-324

NEMA 4X

Emergency Signaling System

Table of Contents

Pre-Installation Information   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .2-3
Components .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .4-5
Install Flow Switch and Mount Assembly   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 6
Connect Signaling Assembly to Flow Switch .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
Complete Electrical Supply Connections .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
Test the Signaling System  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Maintenance   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Remote Sensing Option .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 8
Servicing of Lights  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
Troubleshooting   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 10
Service Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .11-12
Wiring Diagram   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 13
Schematic   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 14

S19-324DGW shown

Содержание S19-323

Страница 1: ...EMA 4X Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 5 Install Flow Switch and Mount Assembly 6 Connect Signaling Assembly to Flow Switch 7 Complete Electr...

Страница 2: ...e beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall...

Страница 3: ...gency fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any...

Страница 4: ...1mm NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 3R Junction Box and Cover Electrical Quick Disconnect Male 3 76mm 4 11 16 119mm Red Blue Black Remote Sensing 12 3 8 315mm System is pr...

Страница 5: ...10 9 16 269mm Beacon Light Type 4X Shown Optional NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 5 16 84mm Red Blue Black Rem...

Страница 6: ...nections C Choose a location for mounting the alarm For best visibility the signaling system should be mounted at least 7 above ground level The signaling system may be mounted directly to the drench...

Страница 7: ...option determine mounting location of selector switch and size flexible cable length accordingly Hook up the wires from the provided flexible cable to control board see wiring diagram while the cover...

Страница 8: ...flow will automatically reset the silence feature The alarm signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The alarm will continue to...

Страница 9: ...ensure the integrity of the unit G Check that the signaling station is functioning properly once the power is restored by activating the fixture attached to the signaling station S19 323 Signal Light...

Страница 10: ...Component failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal...

Страница 11: ...ket Alarm Box GA 61 S90 634 1 General Area Hardware Kit Item Part No Qty Description 80 269 1421 1 Flowswitch 1 1 4 T DPDT 80 269 1522 1 Flowswitch 1 2 T DPDT 81 269 1902 1 Junction Box Conduit Outlet...

Страница 12: ...T 32 269 1316 1 Conduit Nipple 3 4 x 6 33 169 1145 1 Elbow Pulling Conduit Item Part No Qty Description 34 269 2156 1 Close Nipple 3 4 Conduit 36 269 2460 Plug 3 4 Conduit NEMA 41 229 010 1 Selector S...

Страница 13: ...C ECN 17 05 068 11 21 2017 Wiring Diagram NOTES 1 Devices in dashed boxes are optional 2 All powered devices are 24VDC 3 All wires are 18 AWG unless supplied with the device then those wires are to be...

Страница 14: ...ELAY COIL NORMALLY OPEN NORMALLY CLOSED LIGHT HORN FLOW SWITCH FLOW SENSOR COMPONENT SOLDERED WIRE LEGEND CONTACT CONTACT INTERNAL JUMPER TERMINAL BLOCK CONNECTION NORMALLY OPEN CONNECTION NORMALLY CL...

Отзывы: