8
S19-280D, -280W, -290D, -290W, 274HDB, 274HWB, 274JDB, 274JWB
Installation
12/7/2017
Bradley •
215-1740 Rev. C; ECN 15-05-042
Assembly of Components — S19274HDB, S19274HWB
Shown in the "ON" position.
Prepack S65-339 includes items 26, 27, 28
Prepack S88-068 includes items 25, 26, 27, 28
25
26
27
28
Eyewash Cover Prepack
S45-2675 includes items
22 and 23
23
22
22
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date
Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
bradleycorp.com
114-051
1
2
14
13
15
16
19
23
22
25
Deck
21
29
27
26
20
28
30
31
1
2
14
15
16
S19274HWB Wall-Mount
Eyewash Base shown
Base is rotated ¼ turn
Wall
13