background image

Assembly of Components and Parts List

4

S19-220DCPT

Installation

4/30/07

Bradley Corporation • 215-1255 Rev. D; EN 06-532G

1

S90-301

1

Dust Cover /Receptor Assembly

1.1

111-061

1

Inlet-Drain Fitting

1.2

124-028

1

Gasket

1.3

S90-009

1

Dust Cover Assembly

1.4

173-009

1

Cup Strainer

1.5

S21-071

1

Supply Stem

1.6

S05-091

1

Eyewash Yoke

1.7

269-447

1

Bumper

1.8

161-025

1

Hex Nut

1.9

113-1159

1

Spacer, Drain

2

113-006LQ

1

Pipe 1/2" IPS x 3-1/2" Long

3

169-025

1

Elbow 1/2" IPS Street

4

S30-072

1

1/2" Valve/Handle Prepack

4.1

S27-282

1

1/2" Ball Valve with Nut

4.11

110-215

1

Nut only

4.2

S08-056

1

Handle Assembly

4.3

142-002DA

1

Lockwasher

4.4

153-372R

1

Adapter

5

269-167

1

Tailpiece

6

269-142

1

Trap

7

114-051

1

Safety Sign

8

204-421

1

Emergency Tag

Item

Part No.

Qty

Description

Item

Part No.

Qty

Description

P.O. Box 

3

09, Menomonee Fall

s

, WI 5

3

051

R

TE

S

T THI

S

 UNIT EACH WEEK

Te

s

t-operate valve(

s

) each week and 

s

i

g

n below.

Report any malfunction

s

 immediately.

Ventil(e) wöchentlich im Te

s

tbetrieb prüfen, be

s

täti

g

durch Unter

s

chrift. Je

g

liche 

S

törun

g

 

s

ofort melden. 

Date
Datum
Date

S

i

g

ned

Unter

s

chrift

S

i

g

ne

Date
Date

Date

S

i

g

ned

S

i

g

ned

S

i

g

ned

DIE

S

E

S

 GERÄT 1

S

T WÖCHENTLICH ZU PRÜFEN.

E

SS

AI HEBDOMADAIRE

Te

s

t le fonctionnement de

s

 valve

s

 chaque 

s

emaine et 

s

i

g

ne en ba

s

S

'il y à quelque cho

s

e qui ne va pa

s

 fait  

un rapport immédiatement. 

P.O. BOX 

3

09, MENOMONEE FALL

S

, WI 5

3

052-0

3

09 U

S

A

TEL: 1-

8

00-BRADLEY    FAX: (262-251-5

8

17)

http://www.bradleycorp.com

114-051

2

4.1

7

4.

3

4.11

4.2

4.4

1/2" IP

S

S

upply Inlet

8

3

5

1-1/4" IP

S

Drain Outlet

HANDLE NOTE: 

Clo

s

e the cover and

put the pin throu

g

h

the clip to keep clo

s

ed.

6

1

1.6

1.5

Flow Control

Thi

s

 End

1.4

1.

3

1.2

1.1

1.

8

1.7

1.9

NOTE: Items 1.1 -1.9 come presasembled as Item 1.

Figure 2

Prepack S30-087 includes items 4.11, 4.2, 4.3, 4.4

Содержание S19-220DCPT

Страница 1: ... 5817 http www bradleycorp com Installation 215 1255 Rev D EN 06 532G 2007 Bradley Corporation Page 1 of 4 4 30 07 S19 220DCPT Wall Mounted Eyewash with Dust Cover Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 4 ...

Страница 2: ...fy proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Product w...

Страница 3: ...ain fitting to the wall or wall fasteners using 3 8 bolts supplied by installer Step 2 Assemble eyewash 1 Assemble eyewash components as shown in Figure 2 on page 4 Apply pipe sealant supplied by installer to all male threaded pipe joints Use a strap wrench around pipes when tightening to prevent marring Step 3 Connect water supply 1 Connect the water supply piping supplied by installer to the 1 2...

Страница 4: ...em Part No Qty Description P O Box 309 Menomonee Falls WI 53051 R TEST THIS UNIT EACH WEEK Test operate valve s each week and sign below Report any malfunctions immediately Ventil e wöchentlich im Testbetrieb prüfen bestätigt durch Unterschrift Jegliche Störung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI H...

Отзывы: