Installation 

S19-210Y

Bradley Corporation • 

215-155Y Rev. K; ECN 08-538 

11/7/08

15-7/8" (403mm)

42-1/2"

(1079mm)

5-1/4"

(133mm)

36"

(914mm)

Ø 10-3/4"

(273mm)

6"

(152mm)

8-1/8"

(206mm)

Installation

Supplies Required:

•  (3) 3/8" floor anchors and bolts
• Pipe sealant
•  Piping to 1/2" NPT water supply inlet
•  Piping to 1-1/4" NPT drain outlet

• Sign-mounting hardware

NOTE: Local codes may require the installation of 
a backfl ow prevention valve to complete proper 
installation. Compliance with local codes is the 
responsibility of the installer. Valve must be tested 
annually to verify that it is functioning properly. 
Backfl ow prevention valves are not included with 
the fi xture and may be supplied by the contractor 
or purchased from Bradley Corporation.

Step 1: Secure base to floor

1. 

Install three suitable anchors (supplied by 
installer) for 3/8" bolts in the floor.

2. 

Bolt the base to the floor anchors using 3/8" 
bolts (supplied by installer).

Step 2: Assemble eyewash

1. 

Assemble eyewash components as shown 
on page 4

.

•  Apply pipe sealant (supplied by installer) to 

all male-threaded pipe joints.

•  Use the rubber grip pad provided or a 

strap wrench around pipes when tightening 
to prevent marring. Place the grip pad on 
the pipe, then put the wrench over the grip 
pad and turn the pipe with the wrench.

Step 3: Connect water supply

1. C

onnect the water supply piping (supplied 

by installer) to the 1/2" NPT inlet on the 
eyewash. 

2.  Connect the drain piping (supplied by 

installer) to the 1-1/4" NPT drain outlet on the 
eyewash.

3.  Mount the safety sign to the wall using sign-

mounting hardware (supplied by installer).

NOTE: 

All dimensions assume standard thread engagement. 
Variations in manufacturing allow for +/- 1/8” 
(3mm) per threaded joint. To find the tolerance of 
a dimension, add the number of thread joints in 
between a dimension and multiply it by 1/8” (3mm).

Содержание S19-210Y

Страница 1: ...he oculaire faciale sur pied Lavaojos rostro montado en pedestal Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5 Table des mati res A...

Страница 2: ...er operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the plac...

Страница 3: ...r for 3 8 bolts in the floor 2 Bolt the base to the floor anchors using 3 8 bolts supplied by installer Step 2 Assemble eyewash 1 Assemble eyewash components as shown on page 4 Apply pipe sealant supp...

Страница 4: ...te Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelq...

Страница 5: ...4D 1 Eye Face Wash Assembly 5 1 S05 091P 1 Eye Face Wash Yoke 5 2 S05 135 2 Eye Face Wash Head 5 3 S53 063 2 Tethered Dust Cover 6 113 006LQ 1 Pipe 1 2 NPT x 3 1 2 7 169 025 1 Street Elbow 1 2 8 S27 2...

Страница 6: ...es d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuses...

Страница 7: ...on de la base au sol 1 Poser les trois chevilles fournir pour les trois vis de 3 8 in dans le sol 2 Viser la base dans le sol avec trois vis de 3 8 in fournir tape 2 Montage 1 Monter le douche oculair...

Страница 8: ...d Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose...

Страница 9: ...tamis 4 5 113 1150 1 Tuyauterie d alimentation 5 S05 064D 1 Assemblage du Gicleur EFW 5 1 S05 091P 1 Assemblage de cadre 5 2 S05 135 2 Gicleur EFW 5 3 S53 063 2 Cache poussi re ancr 6 113 006LQ 1 Tuy...

Страница 10: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que pu...

Страница 11: ...cesorio y las puede proporcionar el contratista o las puede comprar en Bradley Corporation Paso 1 Afianzar la base al piso 1 Instalar los tres anclajes apropiados proporcionada por el instalador para...

Страница 12: ...te Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rappo...

Страница 13: ...1150 1 Conj del Tubo de Abastecimiento 5 S05 064D 1 Conjunto de Rociadores EFW 5 1 S05 091P 1 Conj de la Horquilla del Lavaojos 5 2 S05 135 2 Rociador EFW 5 3 S53 063 2 Cubiertas contra el polvo 6 11...

Отзывы: