3
Installation
S19-210Y
Bradley Corporation •
215-155Y Rev. K; ECN 08-538
11/7/08
15-7/8" (403mm)
42-1/2"
(1079mm)
5-1/4"
(133mm)
36"
(914mm)
Ø 10-3/4"
(273mm)
6"
(152mm)
8-1/8"
(206mm)
Installation
Supplies Required:
• (3) 3/8" floor anchors and bolts
• Pipe sealant
• Piping to 1/2" NPT water supply inlet
• Piping to 1-1/4" NPT drain outlet
• Sign-mounting hardware
NOTE: Local codes may require the installation of
a backfl ow prevention valve to complete proper
installation. Compliance with local codes is the
responsibility of the installer. Valve must be tested
annually to verify that it is functioning properly.
Backfl ow prevention valves are not included with
the fi xture and may be supplied by the contractor
or purchased from Bradley Corporation.
Step 1: Secure base to floor
1.
Install three suitable anchors (supplied by
installer) for 3/8" bolts in the floor.
2.
Bolt the base to the floor anchors using 3/8"
bolts (supplied by installer).
Step 2: Assemble eyewash
1.
Assemble eyewash components as shown
on page 4
.
• Apply pipe sealant (supplied by installer) to
all male-threaded pipe joints.
• Use the rubber grip pad provided or a
strap wrench around pipes when tightening
to prevent marring. Place the grip pad on
the pipe, then put the wrench over the grip
pad and turn the pipe with the wrench.
Step 3: Connect water supply
1. C
onnect the water supply piping (supplied
by installer) to the 1/2" NPT inlet on the
eyewash.
2. Connect the drain piping (supplied by
installer) to the 1-1/4" NPT drain outlet on the
eyewash.
3. Mount the safety sign to the wall using sign-
mounting hardware (supplied by installer).
NOTE:
All dimensions assume standard thread engagement.
Variations in manufacturing allow for +/- 1/8”
(3mm) per threaded joint. To find the tolerance of
a dimension, add the number of thread joints in
between a dimension and multiply it by 1/8” (3mm).