background image

Installation

As with all electrical equipment, the appropriate specifications governing electrical installation must be 
followed when power factor correction equipment is installed. When removing the front nameplate to adjust 
the function switch and DIP switches, always ensure that your body is not carrying any electrostatic charge. 
This can be accomplished by simply touching an earthed object, such as the switchboard metal casing to
dissipate any electrical charge before removing the cover plate. 

1  Check that the measurement and control voltage, supply frequency and current transformer rating comply 

with the ratings given on the back of the relay.

2  Mount the relay in the switch panel (cut out size 138 x 138mm) and retain the relay in position using the 

ratchet plastic clips included with the relay.

3  Connect in accordance with the wiring diagram. 

Pay special attention to the cross section size of the 

CT connections. We recommend 2.5 sq.mm copper conductor for runs up to 10 mtrs.

The CX relay will

constantly monitor the supply voltage and if this falls below 70% of nominal all capacitor contactors will be 
automatically switched out. Note that the control voltage to the supply voltage to the contactor coils must be 
taken from one of the phases used for the supply voltage to the relay (L2-L3). The spring terminal can be 
pushed open by hand – or with a 2.5mm blade screwdriver.   The steel rear cover of the relay must be
earthed, at the earth tag.

4  CT outputs of 1A or 5A Class 1 are fed into the two orange terminals marked K-L. When using the CXM  

multi-meter version the max. CT ratio is  20000/5 or 4000/1. Note that the CX and CXM relays are sensitive
down to a current of  0.010 A (10 mA) reactive.  The CT input ratio of 1A or 5A is self selecting according
to the max CT current measured. The CX relay is therefore sensitive enough to switch a 25 kvar capacitor
step at 415V utilising a 10,000/5 CT, or 5 kvar step using a 10000/1 CT ratio, provided the max total 
current from the CT does not exceed 1 amp.

Function Switch Control Positions

The function control switch (H3) is located behind the removable front plastic nameplate. For the CX relay there 
are two push buttons ( +  & - )  located  either side of the function switch. For the CXM (multi-meter version)  
the + & - keys are on the front of the relay. They also allow you to roll through the different measured values of 
U-I-P-Q-S-F-COSPHI.
If option "L" (fan control) is fitted there will be 2 additional DIP switches (S1/S2) located behind the name plate 
to select the 4 temperature alarm levels of 30-35-40-45 deg.C.
Factory setting of the function switch is 0 off  - see below.

.

Multifunction Switch (H3) Rotate the switch to the position required with a small screwdriver

0  All steps switched off. If the relay is energised, when the function switch is turned to this position, the steps 

will be switched off after a time delay of 20 secs.  If the + - keys are used in this position, you can select the
threshold level at which you want the relay to show a capacitor step is defective. You can set this value 
between  10…..60% of the first recorded kvar value of each step. The factory setting is 50%, so the display 
will alternate  between "50" and "0".

1

p.f. target set,

selectable in the range of 0.70 lag …1…0.90  lead; Lag is prefixed i  Lead = c in display.

Factory setting = 1.0

Switching time delay in secs,

selectable from 5 ... 1200 secs. Pushing or – for longer than 2 sec. 

enables rapid selection.

Factory setting: 60 secs.

Fully automatic control of power factor correction bank.

LED Display will indicate the system power 

factor with either I for inductive or C for capacitive load (updated each 3 sec.) A flashing dot in display above
the signs or – indicates, that the regulator is selecting a suitable capacitor, if available, to meet the 

reactive load demand. This adjustment is made every 3 secs. 

The CXM relay will indicate COSo - Power factor,  U-volts, I –Amps, P-kW, S – kVA , Q – kvar, F - Hz

4

Manual operation

"H" will show in the display to indicate the relay is in "hand" control. Steps are switched in/out using the +/ - 
buttons. The selected time delay per step (pos. 2) will be followed. This is useful when commissioning a 
bank where there is low or little load. Using the manual control steps can be switched in so as to create a 
leading power factor. Then put the function switch back to pos.3, for auto control and the relay should adjust
automatically to the target pf. selected in Pos 1. 

2

Содержание CX

Страница 1: ...T FOR CORRECT MEASUREMENTS Page 7 WIRING DIAGRAM Page 8 Fan Control DIP switch see p6 Function Switch LED Indication Calling for Capacitor steps in LED Indication Calling for Capacitor steps out LED Indication Calling for Capacitor steps in LED Indication Calling for Capacitor steps out Scroll Buttons CXM With Multi Meter CX BPC Boddingtons P wer Controls UNIT 1 ZONE D CHELMSFORD ROAD INDUSTRIAL E...

Страница 2: ...he removable front plastic nameplate For the CX relay there are two push buttons located either side of the function switch For the CXM multi meter version the keys are on the front of the relay They also allow you to roll through the different measured values of U I P Q S F COSPHI If option L fan control is fitted there will be 2 additional DIP switches S1 S2 located behind the name plate to sele...

Страница 3: ...cedure and alarm AL appears in the display The L and F values for each step can be scrolled through with or button and this is a good check to do on regular capacitor bank maintenance The stored values can be re set by pushing buttons and together for longer than 20 sec The regulator will store each step from the moment of re set Automatic mode remains active whilst these checks are made The CXM r...

Страница 4: ...equence Relay voltage measurement L2 L3 1 1 1 1 Sequential switching in out with fully automatic recognition of each capacitor size This program could be selected for tuned filter banks where it is essential that each tuned step is switched sequentially Eaut identical to Auto but for single phase operation with relay measurement voltage taken from L1 N E111 identical to 1111 but for single phase o...

Страница 5: ...achieve the target power factor 12 With the CX or CXM relay it is not necessary to preset any C k value threshold level when to start to switch a step in out The relay selects the most suitable capacitor size to meet the target power factor Consequently capacitor kvar sizes may be mixed Each time they are switched the reactive output unit of value for each step will be recorded in the CX or CXM re...

Страница 6: ...n site the data output from the CX relay can be fed into our Data Logger available as follows DS 21 0 256 MB Approx 2500 events recorded DS 22 _ 0 512 MB Approx 5000 events recorded DS 23 _ 1 024 MB Approx 10000 events recorded The Data Logger can then be taken to the PC for downloading using a WORD programme Optional Features Option L This option has 2 functions 1 Fan Control It is very important...

Страница 7: ...1 4000 e g 800A 5A 160 Factory setting 100 Holding the for longer than 2 secs enables rapid roll through E v t ratio using key or in the range of 1 0 350 0 e g 20 kV 0 1kV 200 Factory setting 1 0 Holding the for longer than 2 secs enables rapid roll through Relay type CXM indicates following energy data selectable by using key or C Power Factor U Measuring voltage I Current in selected phase P Tot...

Страница 8: ...40 VAC 8 415V 10 Normal Voltage Connection is L2 L3 415V 10 unless otrhewrwise specified on the order L1 N connection ONLY used when relay is specified for single phase supply in which case the connections L2 L3 are not made 415V 10 Normal Voltage Connection is L2 L3 415V 10 unless otrhewrwise specified on the order L1 N connection ONLY used when relay is specified for single phase supply in which...