28
Cleaning, maintenance and maintaining
Jelly power pack Edition 09.09
5.5
Opening and closing the
implement housing
The implement housing may only be
opened by skilled technical personnel
(skilled electrician).
You need to open the implement
housing before you:
•
remedy
leaking
compressed
air
connections.
•
exchanging the agent-hose.
•
exchanging the agent-feed-pump.
In case of queries, please do not hesitate
to contact our after-sales service.
- Open the front side (1) with the aid of the supplied
key.
- Remove the front side.
- Carry out the required adjusting or repair work
inside the implement housing.
- Shut the implement housing again with the front
side (1).
Содержание Jelly power pack
Страница 37: ...Spare part list 37 Jelly power pack Edition 09 09 Article No Designation Component 1586 Flat jet nozzle red...
Страница 38: ...38 Circuit diagrams Jelly power pack Edition 09 09 7 Circuit diagrams...
Страница 39: ...Circuit diagrams 39 Jelly power pack Edition 09 09...
Страница 40: ...40 Circuit diagrams Jelly power pack Edition 09 09...
Страница 41: ...Circuit diagrams 41 Jelly power pack Edition 09 09...
Страница 42: ...42 Circuit diagrams Jelly power pack Edition 09 09...