12
Putting into operation
Jelly economy Edition: 01.10
4
Putting into operation
The implement is exclusively suited for
operation with alternating current (110 V
/ 50/60 Hz). Never try to use other
sources of current. Ensure that the
voltage of the implement and your
supply voltage are the same.
Any work on the electric supply may
only be carried out by a skilled
electrician. Check the electric equipment
of your implement at regular intervals.
Immediately remove loose connections
and scorched cables.
- Check whether the electric circuit is protected by
fuse with 16 Ampere.
- If so, connect the implement with the aid of the
power plug to the power supply.
4.1
Operation
Only operate the implement with all
guards fully functioning. Check the
implement for externally noticeable
damage at least once a day.
Never leave your implement unattended
when the implement is connected to the
power supply.
When operating the implement it is
imperative to observe the instructions
regarding the
•
intended use
•
training of personnel.
Do not drag the implement by using the
power supply cable or the agent-hose.
Protect the spray gun during spraying
pauses against unintentional spraying
by turning the locking device (1).
Содержание Jelly economy
Страница 35: ...Spare part list 35 Jelly economy Edition 01 10 Article No Designation Component 1586 Flat jet nozzle red...
Страница 36: ...36 Circuit diagrams Jelly economy Edition 01 10 7 Circuit diagrams...
Страница 37: ...Circuit diagrams 37 Jelly economy Edition 01 10...
Страница 38: ...38 Circuit diagrams Jelly economy Edition 01 10...
Страница 39: ...Circuit diagrams 39 Jelly economy Edition 01 10...