background image

  T E L   4 1 5 . 7 7 8 . 4 3 0 0   ·   F A X   4 1 5 . 7 7 8 . 4 3 1 9   ·   B O Y D L I G H T I N G . C O M

B O Y D   L I G H T I N G   ·  

3 0

  L I B E R T Y   S H I P   W A Y   S U I T E  

3 1 5 0

  ·   S A U S A L I T O   C A  

9 4 9 6 5

12.05.16

Page 1 of 2

Installation Instructions

E10308 Belvedere I Lantern

E10309 Belvedere II Lantern

Lamping Specifications

•Incandescent lamping

Medium Base, Four, T-10, 60w max

•Fluorescent Lamping 120v or 277v

One,CFQ26W/G24q-3 or

One,CFTR26W/GX24q or

One,CFTR32W/GX24q or

One,CFTR42W/GX24q

IMPORTANT | CAUTION 

READ ALL INSTRUCTIONS THOROUGHLY. 

TURN OFF POWER AT CIRCUIT BREAKER OR 

FUSE BOX BEFORE PROCEEDING.

IMPORTANT!  AT ALL TIMES WIRING 
TO BE DONE PER NATIONAL ELECTRIC 
CODES (NEC) OR APPLICABLE LOCAL 
CODES

Figure 1

Figure 2

IMPORTANT | CAUTION

Read all instructions thoroughly, and turn off power at 

circuit breaker or fuse box before proceeding.

Step 1 Remove fixture and all fixture components from 

packaging. Avoid using sharp blade on packaging as it may 

damage the finish or the glass diffusers.  Locate and disas-

semble the suspension hardware components.  To begin the 

installation process, locate the mounting bracket, threaded 

pipe and misc. washers and retaining nuts and hardware. 

(See Figure 1)

IMPORTANT: Do Not Rely on the outlet box for sole 

mounting as it is not adequate to support the weight of the 

fixture. Fixture must be mounted to a structural member 

such as a ceiling stud/timber or similar component with 

adequate hardware that can support a minimum weight of 

216 lbs.

Step 2 Locate outlet box and with the power turned off at 

the circuit attach the mounting bracket to the outlet box. 

Include a structural member such as a steel angle bracket or 

stud that is secured into the ceiling and meets local building 

codes.  Route the steel pipe up and through the center of 

the outlet box and through the additional support mem-

ber.  The threaded pipe can be cut to length. Use additional 

hardware to fasten the pipe and mounting bracket securely 

to the ceiling. (See Figure 2)

Step 3 Fixture housing and stem assembly: depending on 

the overall height of the fixture, it may be necessary to 

assemble the upper components of the assembly as they 

may have been disassembled for shipping purposes.  Begin 

the assembly process by routing the wires up and through 

the stems.  Use Loctite 2440 thread locker or equivalent on 

the threads and thread the support stems onto the top of 

the fixture housing, fasten securely. (See Figure 3)

Step 4 Locate and slide the canopy cover down the stems 

and carefully rest on top of the fixture hood.  Next attach 

the canopy to the upper stems.  Attach the additional rein-

forcement brackets and secure into place with the retainer 

nuts and lock washers. (See Figure 3)

Отзывы: