2:3 COMMISSIONING
The heating system must comply with the latest editions of British Standard 5410 and The Building
Regulations.
Please note: It is essential in the interest of the Boiler efficiency and reliable performance that once the Boiler
has been installed it if first commissioned by a competent O.F.T.E.C.* registered engineer. It is the
responsibility of the installer to ensure that the Boiler is commissioned.
If an engineer is not known, Boulter Buderus will be please to provide details of commissioning and servicing
engineers from their register.
*The Oil Firing Technical Association for the Petroleum Industry.
2:4 SAFETY
READ HEALTH AND SAFETY INFORMATION ON INSIDE FRONT COVER OF THIS MANUAL.
IMPORTANT
Should you wish to remove or dismantle any covers or parts of the boiler for cleaning or maintenance
ALWAYS FIRST SWITCH OFF THE ELECTRICITY SUPPLY.
1) On no account should any part of the Boiler or its Flue be modified except as specified in this manual.
2) The wiring of the Control Panel should be as the wiring diagrams included in this manual. Wiring should not
be tampered with, modified or changed for any reason.
3) Only use Boulter Buderus replacement parts.
Non compliance with the above will invalidate the Guarantee.
Page 13 of 57
Installation & maintenance manual for Camray 5 Combi External Boilers
14/04/2005
file://D:\PL61500\PL61500.htm