Reports
7
68
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
Subject to modifications resulting from technical improvements!
Boulter Buderus Ltd. • http://www.boulter-boilers.com
Requirement-related maintenance tasks
Date: _____________
Date: _____________
1.
Clean heat exchanger, burner and condensate trap
(see subsection 3.2.3 on page 32)
2.
Check the gas tightness of the gas pipe
(see subsection 1.7.2 on page 11)
3.
Measure gas supply pressure
(see subsection 2.1.7 on page 27)
________________ mbar
________________ mbar
4.
Check and adjust the gas-air ratio
CO
2
-content:
at full load
at part load
(see subsection 2.1.8 on page 29)
______________________
Pa
______________________
%
______________________
%
______________________
Pa
______________________
%
______________________
%
5.
Gas leak test in operational condition
(see subsection 2.1.10 on page 30)
6.
Measuring the ionisation current
(see subsection 2.1.11 on page 30)
_________________ µA
_________________ µA
7.
Confirm servicing work
Confirmation of servicing carried out by qualified technician
Company stamp, signature)