
Page
16
of
28
EM-NRV NORTH AMERICAN SUPPLEMENTAL MANUAL - V2016NRV-ELE
Locking Mechanism, Counter Weight,
and Breaking Element
1.
Install Locking Mechanism
onto mounting bracket of the
EcoMAXX NRV.
2.
Ensure handle is
centered in the locking
mechanism. If incorrectly
installed, handle may rub
or stick preventing the
counter weight from locking
in place during an event.
5.
Insert safety pin to keep
counter weight in place.
4.
Remove Bolt and Washer (if
arm was installed at factory) and
slide counter weight onto shaft
3.
Ensure Set Screw has
Been Tightened Down.