background image

4

EN

2.0 - TECHNICAL DATA

• Use 

: non-aggressive gases of the three families (dry gases)

• Ambient temperature (TS) 

: -15 ÷ +60 °C

• Maximum operating pressure 

: 500 mbar

• Class 

: A (P2 ± 15%) 

 

 

• Mechanical resistance 

: Group 2 (according to EN 13611)

• Rp threaded connections in line 

: (DN 15 - DN 20 - DN 25 - DN 32 - DN 40 - DN 50) according to EN 10226

• Flanged connections that can couple with  

PN 16 flanges : 

(DN 65 - DN 80 - DN 100) ISO 7005 / EN 1092-1

• Rc or NPT threaded or ANSI 150 flanged connections  : on request
• In compliance with 

: Regulation (EU) 2016/426 (Appliances burning gaseous fuels)

 

  ATEX Directive 2014/34/EU

  

2.1 - MODEL IDENTIFICATION

35501216

:   Rp 1/2   DN 15    P2: 18

÷

40 mbar

35501238

:   Rp 3/4   DN 20    P2: 18

÷

40 mbar

35501260

:   Rp 1  

DN 25    P2: 18

÷

40 mbar

35501271

:   Rp 1 1/4   DN 32    P2: 13

÷

23 mbar

35501282

:   Rp 1 1/2   DN 40    P2: 13

÷

23 mbar

35501293

:   Rp 2  

DN 50    P2: 13

÷

23 mbar

35501301

:    

DN 65    P2: 13

÷

27 mbar

35501312

:     

DN 80    P2: 13

÷

27 mbar

35501323

:     

DN 100   P2: 15

÷

27 mbar

3.0 - COMMISSIONING THE DEVICE

  3.1 - OPERATIONS PRIOR TO INSTALLATION

• It is necessary to close the gas upstream of the device prior to installation;
• Make sure that the line pressure 

DOES NOT EXCEED

 the maximum pressure declared on the product label;

• Protective caps (if any) must be removed prior to installation;
• The pipes and inside of the device must be clear of any foreign bodies;

• IMPORTANT:

 to avoid possible pumping and/or disturbances in the gas flow, a straight pipe section equal to at least 5 

DN must be installed (downstream of the regulator).

• IMPORTANT: 

install manual gas closing devices (e.g. ball valves) upstream and downstream of the regulator to protect 

it from any pipe leak test;

If the device is threaded:
• make sure that the pipe thread is not too long, to prevent damaging the body of the device when screwing it on;
If the device is flanged:
• make sure the inlet and outlet counter-flanges are perfectly coaxial and parallel in order to prevent unnecessary 

mechanical stress to the body. Also calculate the space to insert the seal gasket;

• With regard to tightening operations, equip yourself with one or two calibrated torque wrenches or other controlled locking 

tools;

• The safety regulations on handling loads in force in the country of installation must be complied with. If the device to 

be installed exceeds the weight allowed, suitable mechanical equipment and adequate slings must be used.  Necessary 

precautions must be taken during the handling phases so as not to damage/ruin the external surface of the device. 

• If the regulator is not fitted with a filter, it is advisable to install an adequate filter upstream; 
• With outdoor installation, it is advisable to install a protective roof to prevent rain from oxidising or damaging parts of the 

device.

• According to the plant geometry, check the risk of an explosive mixture arising inside the piping;
• If the regulator is installed near other devices or as part of an assembly, compatibility between the regulator and 

these devices must be evaluated beforehand;

• Provide a protection against impacts or accidental contacts if the device is accessible to unqualified personnel.

Содержание 35501216

Страница 1: ...SSURE REGULATOR 356 P1 max 500 mbar DN15 DN 20 DN 25 DN 32 DN 40 DN 50 DN 65 DN 80 DN 100 EN EC approval according to EN 88 1 compliant with Regulation EU 2016 426 CE 51CL4012 ED01 MADE IN ITALY II 2G...

Страница 2: ...2 EN INDEX pag English 3 Drawings 10 Dimensions table 1 13 Regulation spring data table 3 14 Diagram 15...

Страница 3: ...2 KEY OF SYMBOLS ATTENTION Attention is drawn to the technical details intended for qualified staff DANGER In the event of inobservance this may cause damage totangiblegoods topeopleand orpets DANGER...

Страница 4: ...downstream of the regulator IMPORTANT install manual gas closing devices e g ball valves upstream and downstream of the regulator to protect it from any pipe leak test If the device is threaded make s...

Страница 5: ...imum torque has been achieved uniformly Common procedures threaded and flanged devices The regulator is normally positioned before the utility Primarily evaluate the possibility of installing the regu...

Страница 6: ...ns provided in this document it does not pose a source of specific hazards in particular under normal operating conditions the regulator emits a flammable substance into the atmosphere ONLY if both th...

Страница 7: ...E Before starting the system make sure that the spring supplied with the regulator is suitable for the desired adjustment pressure The outlet pressure P2 unless specifically requested is factory set w...

Страница 8: ...ary Make sure the sealing O Ring 18 of the bottom cover 16 is inside the relevant groove before putting it back on Reassemble the bottom cover 16 and secure it in its original position being very care...

Страница 9: ...hts of the warranty or compensation for damage The warranty also excludes maintenance work other manufacturers s assembling units making changes to the device and natural wear 8 0 RATING PLATE DATA Th...

Страница 10: ...10 EN fig 1 Threaded connections in line DN 15 DN 20 DN 25...

Страница 11: ...11 EN fig 2 Threaded connections in line DN 32 DN 40 DN 50...

Страница 12: ...12 EN fig 3 Flanged connections DN 65 DN 80 DN 100 19mm...

Страница 13: ...21 Filter element 22 Top disk for membrane 23 Top cover clamping screws 24 Bottom disk for membrane 25 Membrane disc fixing nut 26 Spring washer Table 2 Screw M5 M6 Max torque N m Galvanised 6 10 Sta...

Страница 14: ...3 23 MO 0850 2 2x29x140x18 20 36 MO 0970 2 5x29x155x16 33 58 MO 1000 3 2x29x123x15 5 55 100 MO 1370 3 5x29x125x14 90 190 MO 1070 4x66 5x155x16 DN 65 DN 80 7 18 MO 1100 4 5x70x200x15 5 13 27 MO 1200 5x...

Страница 15: ...15 EN Capacity diagram Diagram calculated with P1 50 mbar and regulator set out of service dv density relative to the air 1 methane 2 air 3 town gas 4 lpg...

Страница 16: ...he right to any technical and construction changes Registered Office Travis Perkins PLC Lodge Way House Lodge Way Harlestone Road Northampton NN5 7UG Telephone Number 0116 245 5500 www bssindustrial c...

Отзывы: