Commissioning
6 720 808 928 (2017/06)
48
6.13
Commissioning checklist
Customer name:
Telephone number:
Address:
Installed by (print name):
Installation date:
Company name:
Telephone number:
Company address:
Commissioned by (print name):
Registered Operative ID number:
Company name:
Telephone number:
Company address:
Building Regulations Notification Number (if applicable):
1
Appliance make and model:
2
Appliance serial number:
Commissioning
Unit
Values
Comment
3
The central heating has been flushed and cleaned in
accordance to the standards and guidelines
4
System Hydraulic:
Network isolated (indirect) with internal pump:
Single zone radiator circuit (unmixed)
Single zone under-floor circuit (unmixed) + over-temperature
protection
Network isolated (indirect) without internal pump
Single zone radiator circuit (unmixed) + single zone under-floor
circuit (mixed) + over-temperature protection
5
Fill the central heating system and check for leaks
6
Pressurise the central heating and record the value
bar
7
Check for leaks during operation
8
Measure and record values: District system
bar
Differential Pressure Control Valve arrangements
Internal HIU DPCV
External DPCV installer supplied
Model type:
Setting
No DPCV, supply differential pressure less than 80kPa
(800mbar)
Static district pressure (max system pressure)
bar (g)
Working district pressure
bar
Primary pressure system breaks
Yes
Flushing by-pass fitted and closed
Yes
Dwelling isolation valves fitted
Yes
Location:
Strainers has been checked and cleaned
Yes
Table 31
Содержание Worcester Greenstar HIU
Страница 65: ...6 720 808 928 2017 06 65 Notes ...
Страница 66: ...6 720 808 928 2017 06 66 Notes ...
Страница 67: ...6 720 808 928 2017 06 67 Notes ...