24
(b) Remove the burner box cover by pulling forwards to
release the ball studs. This will be found easier by pulling
on one side of the handle first to release two of the ball
studs and then repeating on the other side. Take care not
to pivot the remaining two ball studs too far around as
this will cause damage to the spring clips.
(c) Disconnect the burner plug-in connector by removing the
electrical facia and pulling the three-pin connector free.
Slide the locating bush from the electrical box.
(d) Feed the electrical lead back through the grommet seal to
give sufficient play to allow withdrawal and inspection of
the burner.
(e) Slacken the two M6 burner locking screws, using a 5mm
Allen key, and remove the burner.
(b) 15/19
(c) 20/25 and 26/32
ENSURE THAT ALL BAFFLES ARE SEATED IN POSITION
(a) 12/14
Baffle
retainer
Baffle
Baffle
Heat
shield
Fig. 24
Location of Boiler Flueway Baffles.
Baffle
retainer
Cap
retainer
Transit
retainer
(remove & discard)
Cap
Baffle
Heatshield
Burner
Mounting
Flange
(d) 32/50
Baffle
retainer
Cap
retainer
Top Baffle
(The tabs on the
baffle must be
positioned at the
front of the boiler)
Baffle
Heatshield
Burner
Mounting
Flange
Cap
(e) 50/70