
3.8.8
Initial start-up / Replacing the electronics
The following programme sequence must be taken into consideration
during the initial start-up or when replacing the electronics.
( Programme counter = 0 ! )
Programme
counter
Pump 15 sec.
Salt refill
indicator
Filler valve on
10 sec.
Regenerate
60 sec.
Increase loop
counter by 1
Check
counter
PZ>0
PZ=0
Salt refill
= OFF
Salt refill
= ON
PZ=>3
PZ<3
Start rinse programme
58300000002393_ara_en_a.doc – 31.07.07
Seite 13 von 60