Commissioning 39/52
RE 30214-B/03.2019, VT-MRMA1-1,
Bosch Rexroth AG
Fig. 18: LEDs on the front panel
8.2 Commissioning instructions
Before you can start with the adjustment work the system-specific connections
have to be made.
The following table just shows an overview of measures to be taken when the
amplifier module is to be commissioned initially. A detailed description can be found
in chapter 8.3, “Fine tuning of the complete system“ on page 40.
Table 33: Steps before initial commissioning
Step
Signal
Measure
1
Set DIL switch (inside the amplifier module) while the amplifier
is disconnected from the power supply (see chapter 8.1.1,
page 33).
2
Connect amplifier module
3
Pressure command
value
Adjust pressure command value zero point (→Zw)
4
Set ramp times.
Internal: by means of amplifier module (see “ramp generator
External: via machine control
5
Set maximum value of pressure command value (→Zw)
The following additional step is required only in the case of insufficient accuracy:
Step
Signal
Measure
6
Actual pressure value
of the complete
system
Fine tuning of the complete system according to
chapter 6.5.
When the electronics leaves the factory, it is characterized by the following features:
• Minimum ramp times
• Sensitivity of GW is set to 100 %
• The linearity of the complete system (module electronics and valves) is subject to
series production tolerances
Ready for operation (green)
Enable (yellow)
Break of pressure transducer cable (red)
Condition as supplied
Содержание Rexroth VT-MRMA1-1
Страница 1: ...Operating instructions RE 30214 B 03 2019 Replaces 03 2017 English VT MRMA1 1 Analog amplifier module ...
Страница 50: ...50 52 Alphabetical index Bosch Rexroth AG VT MRMA1 1 RE 30214 B 03 2019 ...
Страница 51: ...Alphabetical index 51 52 RE 30214 B 03 2019 VT MRMA1 1 Bosch Rexroth AG ...