Planning
Bosch Rexroth AG
DOK-CONTRL-ILPSDO8****-AW04-EN-P
Rexroth Inline Module with Safe Digital Outputs R-IB IL 24 PSDO 8-PAC
14.1
Planning
Checklist for planning the use of the safety module
Device type/equipment identification
Version: HW/FW/FW
Date
Editor
Test engineer
Remark
No. Requirement (mandatory)
Yes
Remark
1
Has the current module application description been used as the basis
for planning?
Revision:
2
Are the actuators approved for connection to the module (according to
the technical data and parameterization options)?
3
Has the voltage supply been planned according to the specifications for
the protective extra-low voltage in accordance with PELV?
4
Has the power supply of U
M
and U
S
from a power supply unit been
planned?
5
Is external fuse protection of the module planned (according to the
specifications in this application description for supply voltage U
M
)?
6
Are measures planned to prevent simple manipulation?
7
Are measures planned to prevent connectors being mixed up?
8
Are requirements for the actuators and cable installation observed
according to the SIL/SIL CL/Cat./PL to be achieved and is the
corresponding implementation planned?
9
Are the specifications for the parameterization for each channel
specified?
10
Are test intervals specified for testing the shutdown capability of the
actuators, if this is required to achieve a SIL/SIL CL/Cat./PL?
11
Has it been ensured that any person intentionally starting hazardous
movements has a direct view of the danger zone?
12
Does the planned use correspond to the intended use?
13
Are the ambient conditions observed according to the technical data?
14
Have test intervals been defined?
15
Has the switch-off delay for stop category 1 been observed in the
calculation of the total response time for the machine/system?
No. Requirement (optional)
Yes
No
Remark
16
Have specifications for assembly and electrical installation been
defined (e.g., EPLAN) and communicated to the relevant personnel?
17
Have specifications for startup been defined and communicated to the
relevant personnel?
Date
Signature (editor)
Date
Signature (test engineer)