
576414 | REV. B | 28.10.2016
Bosch Automotive Service Solutions Inc.
en
|
1 0
| Power Xpress™ Dual Bollard Charge Station Installation Guide
22. Position the strain relief at the bottom of the side
slot metal mounting bracket in the steel bollard.
Position such that the rubber grommet (D) seats on
the opening of the lower plastic bollard cover. Re-
peat on opposite side.
23. Tighten the inner strain-relief nut (A) inside the
bollard hand tight. Using expandable pliers, tighten
the nut an additional 1/4 turn.
NOTE: Do not overtighten the strain-relief nut.
The grommet may pull through.
24. Install cable hooks on the sides of the bollard.