![Bosch PM1-LISD Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/bosch/pm1-lisd/pm1-lisd_installation-and-operation-manual_50609053.webp)
Maintenance
The system requires minimum maintenance. Maintenance must only be done by qualified
personnel. To keep the system in good condition, refer to the following sections:
See also
–
–
Check the connectors and grounding, page 53
–
Clean the air inlets
–
The Master Unit can collect dust as a result of the internal fans.
–
Once a year you should use a vacuum cleaner to clean the air inlets of all units in the 19-
inch racks.
Check the connectors and grounding
–
Check all connections for wear or damage
–
Make sure all screw terminals and ground (PE) connections are fully tightened.
Perform a Walk Test
Regularly perform a Walk Test, according to local regulation or contractual obligations. See
Walk Test, page 48.
10
10.1
10.2
10.3
Loudspeakers Line Isolator System
Maintenance | en
53
Bosch Security Systems B.V.
Installation and Operation Manual
2014.03 | V1.1 |
Содержание PM1-LISD
Страница 1: ...Loudspeakers Line Isolator System PM1 LISM6 PM1 LISS PM1 LISD en Installation and Operation Manual ...
Страница 2: ......
Страница 59: ......