74
Commissioning log for the heating system
6 720 617 763 (2008/09)
12 Commissioning log for the heating system
Customer/System operator:
System installer:
Date commissioned:
FD (Date of manufacture):
Solar heating system:
Domestic hot water systems:
Basic solar heating system: 1
: Combi boiler
Solar options: E
: Cylinder on boiler
The following work has been carried out
Water circulation systems checked
Remarks:
Electrical connections checked
Remarks:
Automatic configuration completed
Remarks:
Heating circuit configured
Remarks:
DHW systems configured
Remarks:
Solar system configured
and commissioned
Remarks:
Appliance function checked
Customer/system operator instructed how to operate the appliance
Appliance documentation handed over
Signature of system installer and date:
Tab. 25