15
BASE AND TOE PANEL (Continued)
Plastic Base Access Panel and Toe Panel Installation
(SHY66C, SHX99A, SHE66C, SHE99C, SHX57C, and
SHV57C models only)
1
Place the Plastic Base Access Panel under and up the
front bottom panel of the dishwasher, as shown in
Figure 32a
.
2
Insert the Plastic Base Access Panel screws into the
Plastic Base Access Panel, as shown in
Figure 32b
.
Tighten the Plastic Base Access Panel Screws.
3
Place the Cotton Insulation Strip under the unit,
between the bottom of the Plastic Base Access Panel
and the floor, as shown in
Figure 32c
.
4
Attach the Toe Panel to the Plastic Base Access Panel
using the Toe Panel Screws included in the Toe Panel
Installation Kit. See
Figure 32d
.
NOTE:
You will not use the normal Toe Panel Screws
included in the Dishwasher Installation Kit on these
models.
Figure 32
a
b
d
c
Base and Toe Panel/ Final Instructions
In some conditions, Hydrogen gas can form in a
hot water system that has not been used for
weeks. Hydrogen gas is explosive. Before filling
a dishwasher from a system that has been off for
weeks, run the water from a nearby faucet in a
well ventilated area until there is no sound or
evidence of gas.
FINAL INSTRUCTIONS
1
Energize the dishwasher power supply circuit.
2
Consult the Dishwasher Use and Care Manual, and run
the dishwasher through one complete cycle. If the
dishwasher does not operate properly, refer to the Self-
Help section of the Use and Care Manual. If the
dishwasher still does not operate properly, refer to the
Customer Service Section of the Use and Care
Manual.
WARNING