Engineering information and sizing
Systemlösung – 6 720 885 509 (2018/03)
28
13000 kg/h ... 28000 kg/h
3.3.4
Demand for useful energy for make-up water
preheating, heating energy and DHW
The motor waste heat that occurs in the CHP should
primarily be used for heating the make-up water
required for the steam boiler.
Besides the boiler size, the amount of make-up water is
dependent on the form of heating (directly or indirectly),
on the existing or planned condensate management in
the object and on water quality.
The required make-up ware amount has to be
determined depending on the corresponding standards.
The make-up water is heated up here as much as
possible. Then the make-up water is heated up further in
the feed water container with steam to approx. 103 °C
and is led to the boiler via the two economisers.
In doing so, internal steam for make-up water treatment
is saved and the make-up water heating is used as heat
sink for the motor waste heat of the CHP to increase its
runtime.
Graph 14 shows the possible content of make-up water
preheating (heating from 10 °C to 75 °C) with regard to
boiler output in kg/h and the required additional water
amount in %.
If the occurring motor heat output is larger than the
required heat for make-up water preheating, the excess
heat can be used for covering the heat load or for DHW
heating.
Amount of steam incl. own use of boiler ( waste heat performance) in [kg/h]
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
240 NE
240 NE
240 NE
240 NE
240 NE
240 NE
240 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
400 NE
400 NE
400 NE
400 NE
400 NE
400 NE
400 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
600 NE
600 NE
600 NE
600 NE
600 NE
600 NE
600 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
800 NE
800 NE
800 NE
800 NE
800 NE
800 NE
800 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
854 NE
854 NE
854 NE
854 NE
854 NE
854 NE
854 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
1200 NE
1200 NE
1200 NE
1200 NE
1200 NE
1200 NE
1200 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
1287 NE
1287 NE
1287 NE
1287 NE
1287 NE
1287 NE
1287 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
1560 NE
1560 NE
1560 NE
1560 NE
1560 NE
1560 NE
1560 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
1718 NE
1718 NE
1718 NE
1718 NE
1718 NE
1718 NE
1718 NE
steam boiler UL-S ...
13000
14000
16000
17000
18000
22000
28000
CHP CHP CE ...
1999 NE
1999 NE
1999 NE
1999 NE
1999 NE
1999 NE
1999 NE
steam boiler UL-S ...
13000
14000
18000
18000
18000
22000
28000
CHP CHP CE ...
2000 NE
2000 NE
2000 NE
2000 NE
2000 NE
2000 NE
2000 NE
steam boiler UL-S ...
13000
14000
18000
18000
18000
22000
28000
Table 15 CHP/boiler combinations (13000 kg/h ... 28000 kg/h)
+ 0 boiler sizes
Recommended
+1 boiler size
Recommended
+ 2 boiler sizes
Check economic viability
Содержание CHP CE 1200 NE
Страница 43: ...43 Systemlösung 6 720 885 509 2018 03 Notes ...
Страница 44: ...Subject to technical modifications ...