4 .7 .5
Approved examples of horizontal and vertical venting
installation
•
a
m
Place pipe supports every 5 feet (1,525 mm) of horizontal
and vertical run, beginning with support near boiler.
The condensate must be disposed of in accordance with applicable rules.
•
Periodic cleaning of the vent terminal and air-intake screens is
mandatory.
•
Avoid locating vent terminals near equipment or building features
which can be subject to degradation from exhaust gases.
•
If multiple boilers are installed in a row, allow at least 1 foot (305 mm)
clearance between the vent termination of one and the combustion air
intake of the other.
In the following figures (Fig. 29 to Fig. 41), the combustion air intake pipe
is indicated with the number 1 (one) and the exhaust vent pipe with the
number 2 (two)
Fig. 29 Horizontal venting system (room air only)
Fig. 30 Horizontal venting system (room air only); X≥4” (102 mm)
Fig. 31 Vertical venting system (room air only); X > 12” (305 mm); Y 12”
above maximum snow level or at least 24” whichever is greater
2
2
1
X
2
1
2
Y
X
2
1
Содержание Buderus SSB255
Страница 66: ...6720818454 2016 02 US SSB 66 Spare parts Notes ...
Страница 67: ...SSB 6720818454 2016 02 US Spare parts 67 Notes ...