Commissioning 39/64
3 842 358 792/2016-12, Material and information fl ow technology: HQ 2/C-H, HQ 4,
Bosch Rexroth AG
8.3 Re-commissioning after a standstill period
Follow the steps outlined for initial commissioning.
8.4 Adjusting lifting speed
WARNING
Sudden movements
Risk of serious injury or death.
Final commissioning may only be performed with protective devices in place.
These must be provided and installed by the customer.
Fig. 23:
X
+
-
551 261-23
Y
Adjusting lifting speed (HQ 2/C-H shown)
Please note
:
• Mount the corresponding
WT workpiece pallet before
confi guring the lifting
speed (operating load).
• Try to confi gure the HQ to
lift evenly and smoothly.
Throttle the supply
air evenly using both
throttles to adjust the
lifting speed.
• Rotate in the “
+
” direction
The movement is slower.
• Rotate in the “
–
” direction
The movement is faster.