HINGED PLEXIGLASS COVERS 

NOTE:  Complete the assembly of the hinged periodical shelf before installing 

the plexiglass covers.

1.  Installation is the same for both the one-piece and the two-piece covers.  

See Figure 27A.

2.  Hinged periodical shelves are provided with the piano hinges welded 

on.

NOTE:  Steps 3 and 4 below can be replaced by using double-sided tape on 

the underside of the hinge to fasten plexiglass cover.  Tape not included.

3.  Center plexiglass sheet under hinge.  Using pre-drilled holes in hinge as 

a template, drill holes through plexiglass cover.

4.  Pop rivet the cover in place through the hinge, plexiglass and #10 flat 

washer with a 3/16 Lo-pro pop rivet.  See Figure 27B.

FIGURE 27A

FIGURE 27B

FIGURE 27C

FIGURE 28A

FIGURE 29

DETAIL

FIGURE 28B

WALL HUNG COLUMN STRIPS  -  

use instead of welded frame against wall

1.  Lag or anchor the column strip where required; normally 36" on center.  See Figures 28A, 28B and 29.

2.  Be sure the column strip is plumb and that the tops are level.  Lags and anchors are not supplied and must meet local building codes.  See 

Figures 28A and 29.

14251-00

07884-00

Содержание WILSONSTAK

Страница 1: ... Borroughs will examine it If found defective it will be repaired or replaced at our option This warranty does not apply to any product which has been subject to misuse negligence or accident has been damaged in shipment storage or installation has been misapplied or has been modified or repaired by unauthorized persons or been repaired with non standard Borroughs replacement parts This warranty s...

Страница 2: ...cket assembly into place on the inside of frame uprights and as low as possible Frame should stand upright alone at this point See Figure 4 NOTE a Single face units have left hand and right hand base brackets Double face units have base brackets that may be used on either end b Finished end brackets if furnished are installed on exposed ends of unit ranges 4 Position the frame set ups in range row...

Страница 3: ...be flush to floor to ensure unit stability and secured with sheet metal screws to prevent bracket from working up frame when loaded 7 Secure base brackets together with a 1 4 20 x 3 8 Phillips pan head machine screw and a 1 4 20 hex nut through hole at front of base bracket in bracket depression See Figure 7 NOTE a It is not necessary to tighten nut and bolt beyond binding point since there is no ...

Страница 4: ...RS 3 Insert carpet pins into base brackets See Figures 9 and 10 Adjust carpet pins so that columns are plumb and all pin surfaces bear on carpet 4 Install base shelves See page 8 FRAMES ARE NOW READY TO RECEIVE BALANCE OF COMPONENTS CARPET PIN INSTALLATION FIGURE 10 MUST BE SPECIFIED AS 4 POINT LEVELING SYSTEM CARPET PINS MUST BE ORDERED SEPARATELY FIGURE 9A FIGURE 9B 00954 20 00954 20 00956 16 Cl...

Страница 5: ...rackets and set range against wall where units are to be anchored 2 When backs are required wall anchoring can be accomplished in two ways a With angle against wall and L portion over top of upright b With angle against wall and L portion over top of top horizontal member of frame 3 Level units along range length by adjusting leg levelers and bolts attach ing units together 4 Mark anchor locations...

Страница 6: ...as a tem plate 4 Install anchoring device not provided of the installer s choice or as required for the particular floor condition See Figure 14 TRIANGULAR GUSSETS optional 1 Before joining welded frames side by side sandwich triangular gussets between frames and base brackets and fasten with 1 4 20 x 1 2 Phillips pan head machine screws See Figure 13 2 Plumb uprights by installing shims under eit...

Страница 7: ...3 4 Phillips truss head machine screws and 1 4 20 Keps nuts b Install opposite extension of frame plus an extension of the adder frame into the next T bar upright and fasten with 1 4 20 x 3 4 Phillips truss head machine screws and 1 4 20 Keps nuts Continue to end of range 3 Proceed to level and plumb frames to vertical and horizontal see Step 5 on page 3 Adjust levelers or carpet pins with screwdr...

Страница 8: ...will overlap base bracket edges to give a continuous appear ance along front FIGURE 19 CLOSED BACKS NOTE If closed back is used it should be installed after the base shelf and before any other shelves are set into place 1 Snap a closed back channel inside the open side of each upright of the frame See Figure 20A 2 The closed back will fit between the uprights top rail and base shelf from the back ...

Страница 9: ...f frame flange out and tabs in See Figure 22 2 Make sure that both end brackets are at the same height from the floor 3 If finished shelf end brackets are furnished follow the above pro cedures with finished brackets installed on ends of range only NOTE Left hand end bracket shown in Figure 22 ADJUSTABLE or DIVIDER SHELVES 1 Hardware not required Place the adjustable or divider shelf between the e...

Страница 10: ...ght 10 FIGURE 24 FIGURE 24 FIGURE 25 STORAGE SHELF 1 Canopy top brackets are used to sup port the storage shelf Set canopy top brackets into slots in uprights of frame at equal distance from the floor 2 Set the storage shelf on the brackets with the brackets inside the shell flanges Secure the storage shelf to the canopy top rackets using 1 4 20 x 1 Phillips truss head machine screw and 1 4 20 hex...

Страница 11: ...st and third holes from the top of shelf pan are used with 3 pivot bracket and 12 adjustable shelves b The second and fourth holes from top of shelf pan are used with 6 pivot bracket and 16 adjustable shelves 5 Fasten pivot brackets to hinged periodical shelf pan with 10 24 x 3 8 Phillips truss head machine screws and 10 24 hex nuts 6 Align holes in pivot brackets with 1 4 flat washers and holes i...

Страница 12: ...plexiglass sheet under hinge Using pre drilled holes in hinge as a template drill holes through plexiglass cover 4 Pop rivet the cover in place through the hinge plexiglass and 10 flat washer with a 3 16 Lo pro pop rivet See Figure 27B FIGURE 27A FIGURE 27B FIGURE 27C FIGURE 28A FIGURE 29 DETAIL FIGURE 28B WALL HUNG COLUMN STRIPS use instead of welded frame against wall 1 Lag or anchor the column ...

Страница 13: ...ence shelves should be located at a convenient working height or positioned to suit conditions of assembly The slides and housings are pre assembled and attached to the reference shelf 1 Place an adjustable or divider shelf between two shelf end brackets with the side flanges of the shelf fitting behind the tabs in the brackets Tap down the shelf by hand until the shelf is securely in place Refere...

Страница 14: ...with a 10 x 5 8 Phillips pan head sheet metal screw Reference Figure 35 FIGURE 33 FIGURE 33 DOUBLE FACED END PANELS 1 Align end panel filler channel with welded frame upright See Figure 34A Attach panel to upright with 1 4 x 5 8 Phillips pan head sheet metal screws and tie down clips two 2 each for units 66 and three 3 each for units 66 and higher 2 Secure end panel to base bracket with 10 x 5 8 P...

Страница 15: ...IGURE 36 FIGURE 36 CANOPY BRACKETS FOR WOOD TOPS 1 When a wood canopy top is used install brackets in the top holes of the frame upright and secure canopy side angle brackets to canopy brackets with 1 4 20 x 1 Phillips truss head machine screws and 1 4 20 hex nuts See Figure 37 2 Set the wood canopy top on assembled brackets and position as desired Secure top to brackets with wood or sheet metal s...

Страница 16: ...URE 39A SLOPING DISPLAY GUSSETS 1 Attach gussets to shelving units as outlined on page 6 of these installation instructions Sloping display gussets have a gusset angle welded to the inside of each end gusset and intermediate gussets have gusset angles welded to both sides of gusset NOTE Single faced units will have left hand and right hand end gussets Double faced units will have universal end gus...

Страница 17: ...de of tape and press firmly in desired location CORNER FILLERS 1 Attach the corner filler pieces to the welded frame uprights through the holes provided using 1 4 20 x 5 8 Phillips pan head machine screws and 1 4 20 hex nuts See Figure 43 2 Insert bottom angles into slip joints at bottom of filler panel for floor attaching optional 3 Join the two fillers together at the slip joint provided along v...

Страница 18: ...through the holes provided using 1 4 20 x 5 8 Phillips pan head machine screws and 1 4 20 hex nuts See Figure 44 2 Join the fillers together at the slip joints along vertical edge 3 Place the top cap in position Tap down by hand the top cap until it is securely in place FIGURE 44 FIGURE 44 07742 00 13974 00 ...

Страница 19: ...d one at lower front of end brackets using 1 4 20 x 3 4 Phillips truss head machine screws and 1 4 20 hex nuts See Figure 45A 2 Install newspaper rack end brackets in slots on frame uprights equal distance from the floor See Figure 45B FIGURE 45B FIGURE 45A FIGURE 45B FIGURE 45A 14993 00 07742 00 ...

Страница 20: ... 20 ISO 9001 2000 Registered 3002 N BURDICK STREET KALAMAZOO MI 49004 3483 800 748 0227 FAX 269 342 4161 www borroughs com ...

Отзывы: