Borg & Overström
GB
25
Install & Operation Manual
Ice Tank Defrosting & Emptying - 60-Litre
Should the icebank require defrosting
we recommend the following
procedure:
1. Keeping the power switch on, turn
the thermostat to 0.
2. Make sure water is frequently
dispensed from the chilled water
tap.
3. Leave the device turned on for at
least 12 – 24 hours.
4. Check there is no ice in the tank.
5. Set the thermostat to 6 or 7 and
wait at least 90 – 120 minutes
before refilling the ice tank.
6. After defrosting shut off the water
supply, the CO2 gas, and remove
the power plug.
7. Locate a rubber tube approximately
2m long and a large container.
8. Insert one end of the tube into the
bottom of the ice tank and siphon
the water through the tube letting it
flow in to the container.
9. Ensure the ice tank is completely
emptied.
NOTE:
Do not remove water from the
ice tank by tilting the machine. Water
could spill from the tank and cause
damage to electrical components within
the machine.